|
Abbreviations
(Adobe
Acrobat or AutoCAD) Drawing
Check List
Sanitary
Sewer, Storm Drainage, Water and Street Projects
The
drawings should include the following (if applicable):
Title
Block
(fill out completely - each sheet)
Item |
Comments |
| 1.
Title |
(from City work order number assignment
sheet) |
| 2.
Work Order Number |
(from City work order number assignment
sheet) |
| 3.
Sheet Number & Total Number of Sheets |
(e.g., 1 of 8) |
| 4.
North Arrow |
|
| 5.
File Name |
(City assigned name) |
| 6.
Registered Professional Engineer Number and Expiration
Date |
(fill in) |
| 7.
Names and Titles in Heading |
(correct where required) |
| 8.
Designers/Draftsman/Reviewers Initials |
|
| 9.
Signing and Initialing |
|
| 10.
Date |
(date City Engineer signs) |
| 11.
Revision Block |
(fill out for each change after City Engineer
signs) |
Vicinity
Map
(single line drawing, minimum detail)
Item |
Comments |
| 1.
North Arrow |
|
| 2.
Scale |
(or note no scale) |
| 3.
Major Streets, Highways, Freeways to Project
Site |
|
| 4.
Traveled Streets to and through Project Site |
|
| 5.
Street Names |
|
| 6.
Hatch or Shade Project area |
|
| 7.
Label VICINITY MAP |
|
Plan
(standard scale 1" = 20')
Item |
Comments |
| 1.
North Arrow |
|
| 2.
Scale |
|
| 3.
Property and Right-of-Way Lines |
|
| 4.
Subdivision Lines and Names |
|
| 5.
Street Names |
(place name in private property beside
road) |
| 6.
Tax Lot Numbers |
|
| 7.
R/W Width |
|
| 8.
Existing and Future Curb Locations |
|
| 9.
Size and Type of Existing Underground and Overhead
Utilities |
(do not dimension location) |
| 10.
General Topography |
(trees, streams, fences, mailboxes, etc.) |
| 11.
Primary Bench Marks |
(location and number) |
| 12.
Type of Road Surface |
|
| 13.
House Numbers |
|
| 14.
Manhole Numbers |
|
| 15.
Property Monuments |
|
| 16.
City and County Boundaries |
|
| 17.
General and Specific Notes |
|
| 18.
Match Lines |
|
| 19.
Easement Boundaries |
|
| 20.
Easement Alignment and Location |
(show all required dimensions) |
| 21.
Easement Width |
|
Profile
Item |
Comments |
| 1.
Scale - Horizontal and Vertical |
(standard scale 1" = 20' horizontal;
1" = 5' vertical) |
| 2.
Existing Ground Line |
(dashed line) |
| 3.
Future Ground Line |
(if established - solid line) |
| 4.
Street and Cross Street Names |
|
| 5.
Elevations on Grid Lines |
(both ends of sheet) |
| 6.
Existing Underground Utilities |
(crossing and paralleling) |
| 7.
Manhole Numbers |
|
| 8.
Pipe Size |
|
| 9.
Slope of Sewers |
(in percent of grade to hundredths of
a %) |
| 10.
Sewer Length |
(MH centerline to MH centerline to hundredths
of a foot) |
| 11.
Invert Elevation |
(to hundredths of a foot) |
| 12.
Pipe Type & Specification |
(e.g., Class 52, DIP) |
| 13.
Pipe Bedding Class |
|
14.
Note Service Lateral Pipe Type, Specification,
and Bedding Class within Depth Limits |
|
| 15.
Water Surface Elevation |
(at crossings or outfalls, rivers, large
creeks, ponds, etc.) |
| 16.
General and Specific Notes |
|
| 17.
Match Lines |
|
Details
Item |
Comments |
| 1.
Scale |
|
| 2.
Detail Title |
|
| 3.
Reference Note |
(to location, sheet no., etc.) |
Any questions about the CAD Standards should
be addressed to Kent Kirkpatrick, Engineering Technician by
e-mail or at 503.699.7464.
|
|