Logo Photo
Search the Site
Popular Shortcuts
Jump to a Department


Lake Oswego Home
Find a Document or Form
Quick Links
Arrow Contacts
Arrow Maps & Directions
Arrow How are we doing?
You are Here Home > Departments > Engineering > Projects
First Addition (FAN) Drainage Improvements

 

Project Description

The First Addition Neighborhood receives a large amount of rainwater that has no place to go.  The Engineering Division is developing a plan for FAN drainage.  These improvements include the design and construction of new storm drainage systems throughout the First Addition Neighborhood.  The new drainage systems will be designed to reduce the amount of roadway sediments and pollutants, which would otherwise end up in Lakewood Bay.  Each installation will include facilities that treat pollutants at the source.  Example of these water quality facilities include pollution control manholes and catch basins, infiltration swales, and compost filters.

Funded by:

Surface Water Revenue Bond

Current Information

Watch here for more information.

If you need additional information or would like to leave a message regarding construction projects in your neighborhood, please call the Construction Hotline at 503.635.0261 and we will return your call.

 

 

 

 

 

© City of Lake Oswego. All Rights Reserved.   |   Privacy Policy