Project Background/Summary

This project will repave the roadway along Boones Ferry Road from Kruse Way to the Lake Oswego/Portland city limit.  This project will not pave the area known as the Lake Grove Town Center.

If you would like more information about this project, please contact Crystal M. Shum, PE, Associate Engineer at email.

Project Description

This project is scheduled to begin mid-July.

This project will improve pedestrian facilities, improve stormwater quality, and will repave both Monroe Parkway and a section of Boones Ferry Road from the Country Club Road/Kerr Parkway intersection to the Oswego Towne shopping center at the LO/Portland city limits.

The pedestrian facility improvements include a portion of sidewalk that will connect an existing sidewalk on Boones Ferry Road near the Monroe Parkway intersection to Knaus Road.  The improvements will also include the reconstruction of ADA compliant curb ramps.

The stormwater quality will be improved by the addition of new sumped catch basins.  These catch basins will allow heavier materials to settle out and oil and lighter debris will be separated from the stormwater.

Both Boones Ferry Road and Monroe Parkway will be repaved. 

All of the work on Boones Ferry Road is scheduled to be completed by August 26th.  The work on Monroe Parkway is scheduled to be completed by September 30th.

Updates for this project will be posted on this site once construction begins

ID

WO 189

Type

Capital Improvement Projects

Contact Us

Crystal M. Shum, PE, Associate Engineer (503) 635-0270

Status

Active