Agenda Item - 2021-04-20 - Number 13.1 - North Anchor Conceptual Design Endorsement 13.1 D j'p` t. REDEVELOPMENT AGENCY REPORT r 0 (3REGd\- Subject: North Anchor Project—Conceptual Design Endorsement Meeting Date: April 20, 2021 Staff Member: Martha Bennett, Executive Director Sidaro Sin, Redevelopment Manager Department: Redevelopment Agency Action Required Advisory Board/Commission Recommendation ❑X Motion ❑ Approval ❑ Public Hearing ❑ Denial ❑ Ordinance ❑ None Forwarded ❑ Resolution ❑X Not Applicable ❑ Information Only Comments: ❑ Council Direction ❑ Consent Agenda Staff Recommendation: Endorse the North Anchor Conceptual Design. Recommended Language for Motion: Endorse the UDP Preliminary Conceptual Design for the North Anchor Project. Project/ Issue Relates To: ❑X Council Goals/Priorities EAdopted Master Plan(s) ❑Not Applicable EXECUTIVE SUMMARY Urban Development+ Partners (UDP) is seeking the LORA Board's (Board) endorsement of the attached conceptual design plans for the North Anchor project(Conceptual Design) in order to make formal application for the City's land use review by the end of May, all with a goal of breaking ground in early 2022. The project architect, Hacker Architects (Hacker), has proposed a unique blend of traditional architecture styles for the hotel and mixed-use residential components infused with a modern twist, resulting in a timeless,yet contextually responsive design consistent with the vision of the downtown. Taken as a whole and with consideration of the requirements and goals of the different plans and codes that govern development in the downtown,the proposal is consistent with that direction, and staff recommends endorsement of the Conceptual Design. The Board will be asked to approve the final 503.635.0215 380 A Avenue PO BOX 369 Lake Oswego, OR 97034 www.ci.oswego.or.us Page 2 Conceptual Design as part of the Disposition and Development Agreement(DDA) scheduled to be completed in the summer. DISCUSSION: The Board is being asked to endorse the preliminary Conceptual Design (Attachment 1) at this time to allow the North Anchor project to stay on the schedule established by UDP and previously shared with the Board. The schedule includes beginning the formal land use review process in May, having a signed DDA with the Conceptual Design as an attachment to the document by summer, and breaking ground on the project by early next year. UDP and the design team have been very busy meeting with stakeholders and refining the Conceptual Design. Below is a summary of tasks completed since the last Board meeting in March: • Weekly design meetings with Hacker, Mosaic and UDP • The Len Company was selected as the hotel concept design partner • Interviewed hotel interiors partners (anticipate selection by early May) • Signed a hotel management agreement term sheet with Mosaic Hotel Group • Met several times with representatives from the First Addition/Forest Hills Neighborhood Association to review the hotel design • Held a pre-application conference on April 8 with the City Planning Dept. and the First Addition/Forest Hills Neighborhood Association • Completed schematic plans for both hotel and mixed-use components, and commenced a construction pricing update with R&H Construction,the project general contractor. Hacker, an award-winning local firm, is leading the design effort for both the boutique hotel and mixed- use project. The mixed-use building design is inspired by the Oregon Rustic style, while the hotel takes cues from the Arts and Crafts style. Both designs combine elements of these signature-building styles with a forward-thinking modern spin resulting in unique designs that will create a signature set of buildings that will help create that "North Anchor" presence. The designs look outside of the box for inspiration but respect the design requirements embodied in the Downtown Redevelopment Design District Code, are contextually responsive to the downtown village character feel of the Urban Design Plan and looks to enhance the downtown vibrancy and support economic vitality outlined in the East End Redevelopment Plan. The design team will present the Conceptual Design in more detail at the meeting, but in summary, these two buildings create the cornerstones for the North Anchor Project. Both buildings provide for articulated and inviting corner entries that visually expand into the curb extensions at the street intersection. Additionally,the use of iconic downtown streetscape elements such as brick, basalt, decorative street lights, street trees, seating areas and art all help reinforce the 1st Street and B Avenue intersection as a key part of the downtown fabric and a destination area. Combined with anticipated ground floor uses such as the bar and restaurant at the hotel corner, and retail uses at the adjacent corner,this design will create a lively and active streetscape that will complement the "South Anchor" developments (Lake View Village, Windward and the Millennium Plaza Park). The design intent and development of the buildings is further described below by Hacker. Boutique Hotel 503.635.0215 380 A Avenue PO BOX 369 Lake Oswego, OR 97034 www.ci.oswego.or.us Page 3 The hotel project seeks to both complement and contrast with the multifamily project across First Street for a cohesive and vibrant North Anchor, with a focus on a pleasant and dynamic pedestrian experience. With the high amount of public use given to the restaurant and guest rooms,the design is intended to be extroverted but also inviting.The contrast with the multifamily project also creates the vitality called for the Urban Design Plan (2.15) by making a variety of experiences in the city. The design for the hotel draws on inspiration from nature and the Arts and Crafts (A&C) style, as required by the Code (50.11.001 Appendix A.1).The design sees a direct link to the A&C style of English architect Charles Voysey and Wade Pipes of Portland,who often designed buildings that that tended to be light in color with a monolithic material from the ground plane to the roof, often clad in stucco.A&C buildings reference steeply pitched roof forms, prominent chimneys, asymmetrical composition and casement sash windows, and are surrounded by lush landscaping and heavy stone site walls and planters. A&C designs turned away from classical references and towards nature, natural materials and craftsmanship.Arches are also a feature of the A&C style, used to mark entries. The hotel design focuses attention at the corner,the main entry of the building, and the part of the building most visible looking up the hill on both B and 1st.We distinguish this corner with sweeping asymmetrical roof lines in keeping with A&C style and Mt Hood,visible to the east. In keeping with the A&C style, we are concentrating the detail and visual interest on the windows and entries. As many examples of A&C style buildings do, we are making the entry a special moment by adding grand welcoming arches.The arches are asymmetrical themselves, with broad faceted surfaces that emphasize the thickness of the wall and create a play of light and shadow throughout the day.The arches take inspiration not only from many examples of A&C architecture, but also from the beveled surfaces of the local Rogers Park Blast Furnace arches, as well as ice caves in the glaciers of Mt Hood.The windows and balconies above will be divided into multiple panes of glass and we plan to introduce wood window surrounds,jamb extensions and soffits to bring warmth and natural color to all of the openings day and night.The balconies are subtracted from the mass of the building, creating a background element to the primary mountain form. Finally,to create a warm and intimate hotel lobby experience, we plan to introduce a fireplace that becomes a prominent chimney on the south façade, another asymmetrical aspect of the mountain form. Mixed-Use Residentialf/Commerciall The mixed-use residential[/commercial] component will be comprised of two buildings separated by the public alley with ground floor retail.There will be 69 market-rate apartment units, approximately 108 parking spaces(68 off-street in parking structure, 23 off-street stacker parking system spaces in the east building, 17 on-street spaces), and approximately 6,000 sf of retail space. Both buildings are proposed to be generally four stories, except that the north part of the "west" building (Parcel B) is proposed to have a fifth story. This fifth story will require a variance. The proposed design is informed by a modern interpretation of the Oregon Rustic Style combined with an analysis of the surrounding architecture of the district. The resulting design is an elegant, pedestrian-oriented mixed-use building which authentically reflects the urban and architectural patterns of the district and upholds the goals and guidelines in a fresh and creative approach. 503.635.0215 380 A Avenue PO BOX 369 Lake Oswego, OR 97034 www.ci.oswego.or.us Page 4 We recognize that a connection to nature has always been core to the residents of Lake Oswego. This can be seen in the industrial use of water, lumber, and iron—but even today, Lake Oswego continues to draw new residents looking for an immediate connection to natural recreation, a walkable downtown, and a sense of community. The pioneering spirit, pursuit of authenticity, and reverence for nature, community, and family possessed by the authors of the Oregon Rustic Style also reflect the modern-day character of Lake Oswego. Our modern design reflects this through timeless approaches to shaping and activating the pedestrian realm, and an architecture which connects to light, air, and view. This interpreted Lake Oswego style is reflected through an authentic expression of plan and structure; a terracing massing which responds to the topography; a roofline playfully articulated by'urban A-frame' residences; and building materials using nature-inspired colors and textures. The two multifamily[/commercial] buildings employ an 'H-Shape' or'Garden Court' building shape, which effectively breaks down the massing width and creates more corner units with exceptional access to light, air, and a sense of openness. Both buildings use a consistent design language, but have an opposite massing orientation—allowing each to respond to different pedestrian conditions, and breaking down the length of repetitive facade along B Ave. Simplified massing presents dramatic gabled facades of stained vertical wood siding at the ends, with gentler side facades clad with vertical fiber cement siding and articulated by 8-foot-wide balconies. At the top, unique 'urban A-frame' residences activate and articulate the roofline with oversized private terraces and breaks in the ridgeline. A consistent ground-floor treatment of storefront, basalt and iron-inspired masonry, and planters and site walls anchor the pedestrian walkways along all public frontages. In a dramatic architectural gesture at the street corners of 1st and B Ave, and at B Ave and State- large outdoor retail plazas anchor the corners and provide public areas for all-year-round outdoor seating and gathering. Along B Ave. and State,the ground-floor height varies from 14'to 21', providing a scale and proportion consistent with other developments in the district. Between corner entries, recessed storefront windows provide informal integrated benches stepping down the site. As noted above,the request is to endorse the preliminary Conceptual Design at this time as the Board will have the opportunity to approve the final Conceptual Design as part of the approval of the DDA if it is generally consistent with the preliminary Conceptual Design being endorsed at this time. The DDA will establish standards for LORA's review that includes: • Meeting the Lake Oswego Urban Design Plan objectives; • Creating a quality, upscale, pedestrian-friendly development that responds to the neighborhood in scale and character; • Conforming with the purpose and requirements of the East End Redevelopment Plan; • Complementing adjacent buildings in design and materials; • Using sustainable building design and techniques as much as commercially feasibly possible; • Demonstrating environmental sustainability and using high quality materials in the building and site design and construction ; 503.635.0215 380 A Avenue PO BOX 369 Lake Oswego, OR 97034 www.ci.oswego.or.us Page 5 • Meeting the objectives of retail vibrancy, mix of uses, design excellence, community support, return on public investment, and creating an "anchor" presence at the north end of the First Street retail corridor, as set forth in the LORA Request for Developer Proposals, dated November 13, 2019; and • Meeting applicable State and City codes and standards, including but not limited to the development standards of the Lake Oswego Community Development Code. The design of the North Anchor Project was developed with the above purpose,goals, objectives and requirements in mind and taken as a whole achieves the overall vision for the project and downtown area. RECOMMENDATION: Endorse the preliminary Conceptual Design subject to any additional Board refinements. ATTACHMENTS 1. North Anchor Conceptual Design 503.635.0215 380 A Avenue PO BOX 369 Lake Oswego, OR 97034 www.ci.oswego.or.us ATTACHMENT 1 LA<E OSWEGO FRST STREET \OTT A\CHO CONCEPT DESIGN HACKER Property : ist Street & B Avenue, Lake Oswego APRIL 20, 2021 HACKER ALL RIGHTS RESERVED. U HACKER 1i O \ Ili cn 1VI N (> n- 3 1 t Q o y N 7 N O o z Ir.) Oo w o ,3 4 n O DL N SATE \ Su \iey RMN,27, Q o IE 8 (5)ai34.2 iff Q II �' L "op AB; 0 t— 3 x ��' Q W /� N .gyp / '' :,. 'i 1 n -1 W / M`H0114 1 - 7 �' S5M_14vs 39.96 5 1 t2 X I �� it 'IF NTION _ .>J-- / 01340 k d °m OETE \ -��' 2 ' ' DIN t26.i1 s'3 -' TANK _ �x �� RIM= // ���11 �'�< ,1 FND R`� _ S79 4A 5 c-59:93 r - 2 _-- V a pE p5 522 i ;�/4��� f S/914T1 3 / �� / 7// / /t i// 6 ;�(( PH y \ \ � /. / �//..///��% . mil. �// i 5713 40'154- 907, 1 ^ --k, �-h� '1 �i/ N /// 8 /- ®59.97',//�7% fI = -.nr 1ri' 1 -�1 �) )1/;' BEARINGS 1SRDiNArE _ .c3 r >l�` pL \ 1 ) / 8 IS OF PANE C00pJD IR �.. .� ° ' ��� - ASPH T 1 // l ( ,,, ., x. OREGON SNORTH ZONE.,RQUND u -120 �.- w ! SYSTEM MENTSA �so �v /. j1 �' A / MEASUREMENTS TY OF�� / MEASU ON CIht / " 1/ p 6 ARE BASED RK 18f-1/ 4 .1P 1, / 4 A.90' / �_ _ 11 �i END 5/8"IRSw475n ELEVAGp BENN HOfA 11235 ./ xi +' BELOW -I 2' ',(// STAMPED NORTH LINE ..�AN ELEVAPO '� ��. // ,A wx L �� Q / sus a3�o F Ee 2 o %� �'� �\ \ �/ ,� �\ 8.66' / / //4720,00/7// /, //j FROM RN ��, A 1 w --1- ,,i o ' , r �' '� "_ _ S79'43'11"E 120.08' -�.yvx� wx O nu "r„ ,d M.99 / / + 42 25' 54. �� m R DIN04957 i w 6rn / i_� � �3� / m r/(4 f fN .E�.t9 E 143.87 p .. �� i%; 500 1ST ST. ( ti ) _ ° 5p2.P2 33RN FND TgPGK IN LETA 8.26 1 �' RIMa A �._Wx /' 3 n7 10 ! % J FROM CO R n ^h% ASPHALT _ COORDIN� P R Q, a,O ! .� ( R __ w Svc M PARCEL 1 ( m SN2015- ��07, °o'v� Q r / ( - -__ -' '�11 , 58.46' o ))1 rd � �/i ,� W iP w�'`�N N w ",,,�. 1 mow, 7 / "Co ti �b o < i I-U1- Krfl Z il �. '' // 1 / o �� ,� '� __ ARGEI II 1t26' �� �'I I (� 308'� �I CC�Z t��- I.. N , /.��/ i%!;%,5,9,91 % /'/_��i�.' ; 33xW.x.. wx 1b/ u' " w / w //G ,\ P � , l�r' / I It /'/i ,�i,$0 /. ,/, ) PARCE I _ °> v'' W p"J �. /('� h ra L� BBr r�3 i3E I ��.�/�3�&0����/ 9.05 V J — _ _ � 1 z Sax _� k n: e, y/ / /k 4 ( ter' I LI �Ros 7D5 / I - 45,96' / .r \ f F j FU oPY N ti Z. �� j / CAN �, // PARCEL 1V 4. i _ vy I B A a.A m / N ❑- 7 4� 1 _'- x / // ' — /'"'. - 2/. 25 15T Si. I /, VE r d ���0 "` rQyaR / 8//, SpHALTz// / .� _ // : IN "' .51` ��I �) .! '^ (� N A 1185 I. / 1�%T 1 N / _ _ PARKING 869' 6.2T ;ax 8 < , - / I29 1 / / BELOW I� 1338 _ V ' 1782- y'x I�II 5�t 5 A _ / l,',f i �R�1 D 01337 i� / / -wx 3�'\S - ASPHALT LT q 1 M<128.10 i ttom�,, �; ,� /�. � v� � �yIIN013p3 � m .o 135.35 5 126.6b _ _ / _ © i ^IMF I t RIM= .e,N '_ .J,„ /r rrr' rrr /rig -J /REMB 1--1B 200�% 7:ie 10.66' %1:09/ ° �,,/ tl�, x g -/,1 ..,RpINOt0.83 - ! V1 n r �0. S ^__, _ 37.80' pll �H .. I' ° S) 39'22"E '119.88' . i"' ;;B �' m Di�14so" - g -- I ../ g S'�9 'i ' 'S7939'2 99.93' � _ _ — ,, - �..� r . 6 3•'2 E- 99� ., � r. rn rfi /77 /17 rTl -7 Ni "77J.T".r y SS, . .- .. __ _ ) .f R nw`_J f _.-I i • 20 Qb p lei 7 "^�s ! AMMIIIVA E 1 ,r lJJ TEL i TO] L 1 _ A �� o l��' I I p1}d01371 N , - 1 ti . 4 " ''yr o A cp p2-Wz Wx---DMP{Qt 8�5 Wx Wx I RIM _ ,^�� 'sSr__ I �x D!N 3�� +X \ I DIN01361 A� ; ld ti - m� -� M WX Wx wx Wx Wx Wx Wx Wx W -;3- \ 110-10 RIMS /I ( wx wx wz I wx RtM A x— e` 'fx >: o wn wx wx r wx wx wx .I wr MF wxwx — Sox $Ox 6DzDx ISEx _I sox sOx �7j SoxTT sox / sox ( sox1 SEX\ sox 3Ox I SDx spx : spx SEx spx---.srn.-.r---..spx_._._Jsox-_sOx 3x sDMat2Y �`` r -x I Wx x Wx,/ Wx / Wx Wx Wx Wx 1 Wx Wx �' Wx \126 J 3 Wx Wz Wx Wx VJx Wx Wx Wx Wz t - y ti ybvx� W� Q wx/ x , m SSMH01*,, : / p DM 8.34 48 ,� II _ �G �"- /vex Ha ><�x I 1 wx/ / w a, ° / c5 RIM_i� 8" DIN,¢�56 12 1 /68n / 1 /6MN00815 I / Wx i/ IE 8"(N)=124.09� / IMa1yg.89 / NR RIM ` i Gx Sjx Grp Gar Gx Gx Gz Ox /Gx G RIM=114.14 / ^�i' ti/ D.4 110.6 • g (. C 'd o - r ur 7 P '— RIMa110.95"�� �j S._. / ///�N�� -OHW -5 Q '> 4 / rr rrr / ur 1OHW / 8 OHW DHW !C- r OHW HW OH / N 4 SSM�N01228 J `- -�-0 4 RIM 1p.98 �� fND MAG NAINATES tE(N N)=104.24 liZg.62 RI � �' PER SN2�`'-052 104.08 1 3 FHEiD PERT PS 536 a 16 1 ,� UDkP HPGKE. R 1 Lake Oswego First Street North Anchor\April 20,2021 SITE 1 Pr000sec Site Plan - Civil LI I : i . EXISTING I O PAVING NOTES CD I l 1 BUILDING = I ~ - /\..,, / 13 coo ,1'�1 1. CONSAWCRETE UT. 1 ! \W \ '1,-_ L[Lfl,{E _ _ Qm/ /� 2. CONCRETE CURB PER CITY OF LAKE OSWEGO STANDARD © EXISTING \ry6 -- - - - - - - DETAIL S2-01. w _ s_ , ti� \y 3. ASPHALT PAVING. BUILDING �PROPER�T I1dE 3_ 1n6 a 17 N 4. CONCRETE SIDEWALK PER ODOT STD DETAIL RD720. 1� • - 7,, ''' ` m %I�Ir 5. ADA RAMP PER ODOT STANDARD DETAIL RD755&RD756. 2 �$,tiy II, 6. CROSSWALK STRIPING. _ ^ 7. CONCRETE DRIVEWAY. p 10> �� I �l+ / �- _' 135� S. CONCRETE CROSSWALK. 1 • ^� ° �18 EXISTING 9. BRICK PAVING. L I 1 a a'11 BUILDING Q �N , 3Ni 14 ,ti,I I N l �' L /\ ,�I 1 12.0' �� '00 g _I 100 r,. 4 2 1 SIDEWALK a Ic - C OTHER NOTES PROPOSED 13 CORRIDOR PROPERTY LINE — i x�y. \ SIDEWALK I 7 w 10. STREET TREE AND 4'X4'TREE WELL WITH TREE GRATE,TYP. BUILDING / \CORRIDOF LLI —I E. -, • 15.00 O 6.5' `=o ` \ / ..SIDEWP LK 11. BIKE RACKS. �7 r ' 1Ce PLANTER / Fr I V ' ® O CORRI�R 12. BENCH. PARCEL A I 13q +f ik�[ \I 4q V / III 13. TRASH RECEPTACLE. C _ (� �-• _ _ I I Qy1 I 10 14. REMOVE EXISTING STREET TREE. r- I �V NT --- I 13 �, I ,�, 3.50; 15. PROTECT EXISTING STREET TREE.TYP. p 20:3' CANTERS 9 I— �, i` ROIti 16. PROTECT EXISTING TRIMET BUS STOP. BLIC AL3 I I I d D PROPOSED DEDICAI ION 17. LIMITS OF UNDERGROUND PARKING STRUCTURE. }742 -133 , Ir L- �13-- Pe -123 7 I 81 I® 3 I 12' 18. PROPOSED PARKING ENTRANCE. - h<I 11 BUILDING �� 19. INSTALL ORNAMENTAL STREET LIGHT,TYP. 03 3, PROPOSED ^f I PARCELC 7q7, . - A 18 I l 11pp„� : 04:0„:),44 BUILDING ��, / i I I ; W SHEET LEGEND _$ L,- 2' 9��" i /' �... PARCEL O �� �� 3 ll.l AN 13 ^ti - I iu L I _- / ._ -o-ci _ J _ i \ p� PROPOSED ORNAMENTAL STREET LIGHT has, 35-I - / 7- �- '�('�J �/ 1 II ❑ I a!' 16 (/� /_,V I /' ,-/ PWR /' 3A 19 g z�/ I + 1 �� . V 15 ll.l PROPOSED TREE // / / ' �,:::: �F_ q1' 4P�� '1 . � � I- O TRASH RECEPTACLE 19, �1 /p / / / L- -� /' 1 C. . .'.'. ® �� � i -' / PWR �� -IY g'. (/)I o BENCH rr, 3 / /?<2 /L ••' S 0 110 4 O¢ cil � II BIKE RACKS N1.5 �J-/ �ww rA,�oz I- oL2 e �� < v2o o � - I/ I 26'' a 12 I ,/ a .gs' �og • n�7 w ®h� - � 4�� -CY �°'� ( 5 L/-_ J _ / •I�a A PROPt9SF� 4T / 14 / OW ® ® _ zr I �� I J III _: ��� �� a , / 1 j1 1. 2�3' / I II L I V vI l �a ad h u h �� 1 JJ �I�I � • � i — oms�rd�� 7ni� eir'rli wm�odn a 1 I'71 �� m R�F G -- 5 q' - 7.•'/1 0 �a N ., �i --r-d I -• \ 1,4_77.__Q �1 A ����/ � I 1 T PARKINGA� ` ifl��fin \ I of LOADING ZONE L4 A. , I I ^ \ 01 I <1 BIKE LANE I IW.�"I/ / I I I Iro BIKE LANE I L I �.m \ �� I a ro \ _ �/ 4 14 I 2 4 3 11 10 TRA�EL LA / 19 0 - / 0 �, TRAVEL LANE 7 I� 0 4 I /,-,__ �, lol p o o I o „ �0 b L�� mm �� 000T® 0-IN © m m ' a !— / / i T 7 �' I---- / CENTURY LINKS / f / ) / / / /� / / 126� MANHOLE/ M .y'0 �; n .'i �/ / / / / - �- - / o / / I / / / / / / ) / / / O �ti� ti� 4, z o B/AVENUE n , ,.,'• ', ��� ,,, 4` e ..:1, 1 �n/ / / / / , / , r7AHW OHW- -OHW -I., OHW OHW m r- -..HW i OHW OHW OHN.0 c7- __ _ ROW II I I 1—__ ROW 1—__ _ _ ROW v CONCEPT PAVING AND STREET IMPROVEMENTS PLAN N CONCEPT STREET IMPROVEMENT PLAN SCALE. 1"=20' 0 20 40 AT22034 DRAWN BY: CHECKED BY: VEGA TEN MSW 1 INCH=20 AT 22 0 FEET DATE 2021-0324 1" CIVIL ENGINEERING LLC REVISION 11X17 SUBMISSION SCALE: 40' — 1 503.349.13811 WWW.VEGACIVIL.COM SHEET NUMBER. VEGA CIVIL ENGINEERING,1300 SE STARK ST 9207,PORTLAND,OR 97214 Lake Oswego First Street North Anchor 1 April 20, 2021 UD+P HACKER SITE 1 Site Plan ///f v - _ r 7// , . 1 , , . , , 7 , , ,__ 1 A , -- PARCEL A: 119'-1019 32" .I� J ����������������� A/ i 80 0 PARCEL B: 119 - 10 5 16 20 -0 PARCEL C: 120 1 1 32 /._ , , ,, __, rr - -----71f-1 -- , ON STREET PARKING / oa 135�(' _� PARCEL B (MULTI-FAMILY) �� 7,4L 1 _w w Lu (NI N Q CC 00 PARCEL A HOTEL ' e��" oLu I— M VD r, r, w I- 1 PARCEL C (MULTI-FAMILY) Q titi rn I— / 'Si , Z:n v) J z / I _- *r-it 1 1 Jar -1,f - t it —� yr [_ :�� LIA Iii I 1 /�ia� i i I i w f �� - - 1� --�— DELIVERY LOADING ZONE, /i \'' p GUEST LOADING ZONE by �' SW B AVENUE (' s 1 1 5 ON STREET PARKING ,' titi gli � SITE PLAN - 3 Parcels \/ =1 1/32" = 1'-0" SITE PLAN - 3 PARCELS Lake Oswego First Street North Anchor 1 April 20, 2021 U[)+P HACKER NORTH ANCHOR I View frog ist Street . -- - /1161/01441°I ' I: 407 - VP-N. . ter. . J s �` f J ' •r•� 4. 7 f { y `� • f. � 11 � _� '�. t r • i lk,#. f'''' - --- �, - — -i 7 f•� .. of . /4111*\‘''NI.. 1.1 G d f a-r....'1'1.14:1.1 lk NI( iii I•• ; .,; 0111 i i 1 , , . . . --I�r.„...._.7"...s 4. —' 1 . I :d - -' iii _ -S.',;:' _ 441-. ft-7s-J.- - . Nr ..7...-'.---t.i+,...' ..... , _, . . ,... .A1 .. !I . . .., ..w...z. ....:._;. .. ... ..__:: 1 , , . . . ,.. ,...,. . ... ..41,4 • . Ili , . ... . t.,...4.4ist ArAve ‘t,....-i- 7-' --:' 44' _ � � r `� •• ' r. =• .t' +# J Y rJ 1 L f. s .. -veil 11 f116111 s :We" - t se � r -' � Jr �M.�.~` r PTO - J i � • _ • r T _ . . _ 7 •r t i .'OP° . :r ". ! ... r �, . + •a.� �..r. ti. re 40 Mir - IV. ---.11/., ;1: ,\., ''''.- ..4 4. t.n.- ' ' 1 "7 . killA& :: ''''' "It . r.. A ‘. . el, k .4 iiiiippopiso, k ... r :t . --- -. , I :. ' 'Ilk '‘.'1. .*k.'-'1 I/1 ' "lei: -. : - :....--- �"M t T 1»w_&I c•_ ) - ' ":,*Iall....t''' • 1.--al.:- ' -•/..-, '- - A . )• - -_,,...:. ', Lake Oswego First Street North Anchor April 20, 2021 �.) ; P HACKER NORTH ANCHOR I View -rorn State Street �' ,._,....,"__ _..1.._, d"41:3 ,, •.! :..,,,filiii . , - - - I 1 .4.17- . -- . : '.." - 1 P [ . .. : 1 ...._.i . ♦ die , el : ....... l' - IP: . ,''...' .1k.'' Cf.1'•-•-.,, --- . :,,:.i if IN li- ipillo,,r4.. .1:ii. :41,,S' - I ' -,--'k', ' 1 ..1,1/11-•' : +.•111111:',.3 iri a . --ram :_ '. if. .f ,�9: - A/�[• 1".�• s• A . I+ i,.. , -ye- .-,! - -. _ 7rt � ."..!...d'.d.w-: 411111. 1- tr''... .11E' . ' 42-... .. `r�[y��- •_helir 1 s e. �I ��. i !. 1 1 ,, I T :r II fin. ;. b�`, sta. fizi! i toj.. 1L. Fit :ilk. a t • Lake Oswego First Street North Anchor April 20, 2021 LJ I P HACKER ote g Lake Oswego First Street North Anchor April 20, 2021 U ; P HACKER oteL Development Summary A B C D E F G H J K L M Unit Types Per Floor Constr. Circulation Common/ Low Eff.0/0 Floor F.A.R. Parking Restaurant Structure Balcony Guest Room Units A B C Gross or Service Amenity Headroom (D+J+K/B) 5th Floor 4,205 4,855 0 0 0 95o 0 0 65o 3,255 80.43% 6 0 2 4 4th Floor io,449 11,326 0 0 0 2,263 971 0 877 7,215 71.45% 19 11 6 2 3rd Floor 11,314 11,905, 0 0 0 2,281 1,225 0 591 7,808 70.55% 23 13 10 end Floor 7,074 7,186 0 0 0 1,560 469 0 112 5,045 71.76% 15 8 7 Above-Grade 33,042 35,272 0 0 0 7,054 2,665 0 2,23o 23,323 72.45% 63 32 25 6 Parking Level 1,857 7,357 5,500 0 0 1,857 0 0 0 0 0.00% 51% 40% 10% 1st Floor 7,586 7,586 0 2,110 0 2,444 3,032 0 0 0 27.81% Combined Total 42,485 50,215 5,500 2,110 0 11,355 5,697 0 2,230 23,323 55.090/0 63 I i00% ZONING REQUIRED AREAS (EX, DRDD) Req'd Provided PARKING STALLS Qty. AVERAGE UNIT AREAS Tot.Area sf Unit Avg. sf Total Site Area 16742 SF Parking Level 5o A 9,579 299 Maximum F.A.R. (3:1) 50226 SF 42485 SF Street 11 B 10,143 406 Max. Building Coverage 16742 SF 14943 SF Total 61 C 3,601 600 Blended Avg. 23,323 37o sf Lake Oswego First Street North Anchor April20, 2021 Emosaic IOTEL GROUP UD+P HACKER LO StyLe Arts & Crafts - 50 .11 . 001 Appendix A .1 • Ins i red bylocaltraditionsand ., — jc1 .p nature _ ` „ w a � �A M1 �. r .. ; Y f 4i IF'l�y • • r • Natural material and fine craftsmanship -. * g:.�. W _s tis ` .r 4._. f • . . • Examples of architects CFA Voysey and - � � ,„, .. ,. ••,F Wade Pipes - 13, - a _ � ., • Steeply pitched roof, often with intersecting • -,4.„;: w ii] !!] , f or double gable dormers, or with one slope r,a . occasional) sweeping n close to the round . � = _ Y P g g - __ _ 71 - F . • Prominent chimneys • • = rti , ; F�c .. : :@ _ • Y�':-4,.-9' .z.t�fr,: is • :q• • Asymmetrical com ositiongenerally P e� rectangular, with roof, window and porch - - _ = a Pipes • • •projections ,..._:•.• 7 7—'•7 ,,.7,-,.•.•-.' • " , .-. . I.. ' ••' •.- ,.- • Casement sash windows with manysmall 4i ....:•.,..7....„.,...*,,,,,,_r. panes, segmental and round arched used for Voysey =« . . ...tok ilk .... .444.r . ;....... r accent openings used foraccent . �•'. . ii, • Stucco, shingle, brick or horizontal siding sometimes used in combination . P `- . • Simplified English vernacular elements /-7„, - - _ such as simulated half-timberingand - illi ... .... L .. I. simulated thatched roofs . DTI i �b ._ # , i'. �v .1g I Pipes } AgLits_ ; -V. ''..1"' . 111 r,. . -K .tit' ,- "Al..... k yrFr L.' 41.4 Y fi �g -i f 1, _d*' ,.i, a .....„ 5g,- ,iti*g., , ,...v.-46.,' ih.. , fVW 't. : ' Fr Lake Oswego First Street North Anchor April 20, 2021 - ilmosaic IOTEL GROUP UD+P HACKER LO StyLe Arts & Crafts - What we see __..... ..", ., • -• ,.. .• „....)„,: „.--,=.".,..„_:.,..„, _____ . ,... • , •. . • ,.... .. . _...: ..,„ •,,,:•,,,,. ..,, ,__-,,.. . L ..••.... •• .. . .. ._ 4 . ..,. • , ...,..,,. ... • • One wall material ground to roof , . ,..„ • .. ,, _� - • • • a• • : , • ... Light colored walls canvas for• . _._ • .. _,r r • plantingsandplayfulwindows ..— ._ .. ■ii liii - - . v y - nil• Arc esmar entril lr _ 1. ' 1 r 'V ; fix- - .,• r 7 '''�-'P .' ... • • 4littit . •. • • •A u.' :.- S 'O ,I \ _ • s ' • — +i • x • • } 4 M1- • ' fi �' '..• • :..., ./Irr . -e....-Au •, iii ` � ' ':. i f • / ` / ■ •' • 46 �1 y: .yk',e�l' .. . r.. rt ..edf. 5-'' �e it r •*� -'_:. .. t}� .X� , ....._ „....,.,,..,..: ..„.....• . . .. • ...: • . .., . .,.:. .L., ..., .... . .... .,., , ... • ... *. .,_„..0 ... , . : „ . :. 7:—..•• • a• a '�y{di„,....' ry J..• i 1 �.4' t •y ,I },�.. M1 :: ' "• ,rye rr '' +'""�5 '4 • `}. I, _ r: �. r y `x- • r' �^ w ,_ �,¢ E ^.r—a�.+.rar yiie .A . r • _• .: .,A l■ ■■ ■g,�.F �7; +r` . -.111111111P Voysey _x �` "' ; 1 y - • ,_ .. :- �- _ . �' '.�; . �.:. Voysey • • Pipes _ i ` .;; . '-_"; ~� ` � mosaic p HACKER C K E R Lake Oswego First Street North Anchor April.20, 2021 © OTEL GROUP UDI LO StyLe Arts & Crafts - Inspired by nature and local traditions of Lake Oswego ___ .. __. .. _ . F. ..,,,;,..,, :,-- L . ",, ,. . , 1 ,: ,.0,..._,.b.ji, ,....: e . _ _T.- i- ,.. ..-'-.4: :1111/ • P 4 i)it .1; •..,*,'S ... -, .-•• e:• ' / I :11: • rigkiller ,. : _ .-, '- r !' —, ,.. . • 4 :*1 . •:.' ir 4 . f.7 , if, 1 4,-. 1 . I • ,� • . .. .... 4 i '. • A.-_ . i, vaillb', - - _ , . . . .. • , , , r y. • e - i will10, 4rilli)..---- it • � +� ,f f• - '. i.-r _.. — �^. _ . ! _ ' �� .ff. • `' R7; . - -i' r �• • .cam - ._. . -t,,_ , ir - ,__. . . .: ••••r-, Mt Hood Inspires the form and the-color Basslal ins. -es- e con rasting grown :n.•ro• 'Historic - diistry inspires woo. .."-ning iii. i• + •I. 's me�, • . m- r 0 r • { li �r { 1 - r -, i• mosaic Lake Oswego First Street North Anchor April20, 2021 II IOTEL GROUP UD+P HACKER Z Hotel AcriaL view fro m ist aim d B IgH__________irri _....4.40 -.4% terIIIIPP . • , . __.,...z._ _... . ,........ _ _ . __ -----1Pigh - 41% -* ..gur• ,*:,isittio' . . it:::: .. 1 "r :-•.- ''' mow_ , - • ' y� ydig.• r+ ,�F i !` }A,r', - .,+� ��- ritli AL I .,� Ill„ ,,......__.. ., . -1.--.:4- ---__ ' it- 1 .141r. t_ _____ .. k' . .,..7, ..i .. I 10, ..___ .. ._ r...„.,.....• it. ' ,- _. _„.. . .. ........ Mlle. 1 1 1 1117 - ,-,-.. ...--- ,...%;,... . . . it-- .1., - jt 'i . - *-4% ' •-.-- Fe -- tF r" r b;.A F` O. • f ritzr.„44A • `ray' • �'1111111 M 1'A a � a S►/' f �' IT f, � • Mi - a • ? .- CIF . "' + V. M ¢ ;, . ,.. . ...e.2--'111"- . 11;41`...-.. -•-'- - ,,,,,,,L -- - .0 • 1"4,...', - .e, • nu% i 1 - --..., , •1 •• Igir ,j:010 \ • .• r 11 0• .! : .. tl . Y rw ifs : .. ._ NIfi 1jillPik . ram- ........,4 A mosaic Lake Oswego First Street North Anchor 1 April 20, 2021 11 IOTEL GROUP UD+P HACKER Hotel AeraL vew from 1st aNd B A&C CHARACTERISTICS Nature inspired - form and 121 4 F61 n 5 F31 I-71 material 4 __ 2 Asymmetrical - roof sweeps �-� Lower one side 3 Casement windows and many kmor I . vim • _ panes t t_ s , ,.. 4 Prominent chimney ,.- v ir, ,-.i9_ .. r k . ..,:__ ...i 1.4., .'.11...—„..1_... Asolki.fti... VIKI I r �I ■ ; _ . . 5 Stucco - ground to roof ff , :4„.-:;a's4: ' , ,r , t 6 White walls - canvas 0. L for playful windows and plantings ,17. ...x,..i.'"-7.44,---c ' 4, _ , 4..., ,... _ . =�_*` A /tr.- 7 Arches mark entry lint,1 -ill" ..404 iii _ _. .. 44 yam', I , . _ ., _ ,..„:4 __. 'V --4 Silk 11111 O - 411111 r . --- . - 4=1. til Witt IN . ------AI . mosaic Lake Oswego First Street North Anchor ApriL 20, 2021 P OT E L GROUP UD+P HACKER Hotel AeraLvewfrorn1stad B DRDD CHARACTERISTICS A 80% storefront A IDI F C IH IE IBI G D IAI B Ground floor stucco 11.111111111162 fir v------, C Upper floors stucco (Requesting variance) 111 { IN D Cornice created by recess I .. op l ` f ,R sky , �__ Rill .—, . tt% .., ...., ,, , E Cuts corner - arches le 4 -ry'':!7., 4 111 create structured corner, fr-sori, 1 " '0r compliments open space ri across street. 'V .,:#4;-.. iii=. ,, I,: ; i7 F Window surrounds bring t ....� � a ;r warmth and reference to r�s r ; i historical LO industry . * Akio; ._1 ,4, 46 ._ . . : _,. , — . ill - - r,,,,,_ . ok . , _ G Building opens to outdoor Y .._x. seating „ s I... ,ot IM '1r y - x�` F - H Basalt- like stone planter walls r 1. , , 1 mosaic Lake Oswego First Street North Anchor Apri i 20, 2021 IM OT E L GROUP UD±P HACKER Hotel AeraL vew frorn -1st Loo < g so . -L. nwes�. _ . _ . . . ....... -._.. hi- I - k• -iiii 1 4-e .R. 1 f, ' '''.1, r...'-' .;:7;leott$';‘1-i• il,r. ,', - 1,, lir ' - '. Illf . 1,4,.•.. • t t I Y4..:',,*";;f1'.-ff°8-47041 • .', - :A ,-'•- '.7 I i !I _ ate ' . 7 7 i _ 1111116. ' IS i 1 i I ' .. 1 ,. ..,.., , - , . .. ,_ _.I.,'-1- • 4.4.. ' 4, .. - -�. Iii Y .---- - lir • - 1i }: 4-i.•• Sit'4 * . pie. ,' '•• •4— .. ' ..- ;-`•-••:. . e AN i ' - • 11. felik I i 1 4 IIMMINIMIJIII . • ‘24-tt ' '.t. ' ' 1*4 y ' it . , :1 .. •••. .04. ...44. I .„.. iimbig....._ _gilt_ ,, mosaic Lake Oswego First Street North Anchor April 20, 2021 El OT E L GROUP UD+P HACKER Hotel AeraLvewfro �n B [oo < gorteas - . . .. .,...,;,..; .1. -.4.4,„ .....,4„,„ , _ 1.1. ,. .i„. , .. ..... OPP . , _ -., :.el ilitiehotp. I Pli .. . . Mlik. . 1 1, 1'11 ---ii ..,,, it ••.•:., ... 411111111101111111P. 1 . ik I il- .' Al* *. - . ""-4.4...,.. I .i.7...,... r_ 7!,,, : -: , ... ..‘. 1111 �: a ,� :fir► . Illi •• 1• : elor..4-7 : *7-1 ‘7. '-- I \ . ------, 1 .,, +t f:_.fi t -a- .. ` • Ay' . ..)4.4 _ 1 2- .•. _ i `}\Ikmil ;..ti _•it,, } - It. ..:' {,/ 'tr-„r • ' _ - III w • - • "�;. . *.$, —... 1 p-''. y �... Firr- t 'CMS - - r sir 4, I_ 1 - '' +17 -► � _ Ii • I 4j. fit" * ■ 1:.1 •#_ip• iiiivitimeo -. il* I . , t: .:.• - '1111----sct il or-•. ,i-i, 4.... ,-L • . i 's • • . :-.• • ' ''' 111•• - -, illt e mosaic Lake Oswego First Street North Anchor April.20, 2021 © OTEL GROUP UD±P HACKER Hotel Aera [ vewfrostad B [oo <Hgortwest illir iivionsupp... t _AO t It: ',.' , b - ; _ _-. _ _ _ . , .. k (ma. L.,„ _ 4.P.- - 4414141r: yf ' Art- -r. 4. i � � A r /el" . t 4 :,..10.4\-,;44,. .__.- 111:k, /- . 'i . . e ..- P is. lor I . ,........, iiiiit : . ,..,.. . .., 1 I . . . .4,... N . lfrr . 1 tki) ill)ir e 1 ? if iiiii \ ... .r.,.. . ' ',4,.` .. ltk lit 'ly.,,\;:: :::.i,,'''. % 4111100 �` r s 1 4 r ' 0 k... lop i4t4. 1%,111, or mosaic Lake Oswego First Street North Anchor April 20, 2021 j© ,OTEL GROUP L.JL) ❑ HACKER H ot el AeraL view fro m 1st Loo < gsowe .10, . _ . , '1"1-1 . loi 6 ,.: _.. ...... -- I A It ' lit h ......._ . . . - iiii... .4 1 i . . ,, , , i Erg i- tP-iii1/11 :.... : • _ ..._ 1 \i)...... . • ____ ,. . ,. .*. A. ..., qv,, ... ,.., ilk i '' N / lizizi_ s -,7, ... . - . Lb . ..ti-. . ti. - 1 it I VP. 4 _ , 1 . . . . ( ..411.` • 44' • , -..444.t.....: , Illis, ' .,1741.I .••' y` % NYC '_ ,, 4, 1`. , :. .. 'MM. �. + t, It { . t, hit i * i _ • :.• . ... k. 'S [ lk, ' .' ' ' . -... :' W. ! i )11, mosaic y Lake Oswego First Street North Anchor April 20, 2021 111 , ULOTEL GROUP J+I HACKER (11) (10) () (8) O (6) O (4) (3) ( ) T T T T T T i ,—III-111-1 I I—I I I—III I I—III—III—III—I 11=h KI I I—I I I-111E111E111—I 11— - o �' 11 1 1 11 1 11 1 11 1 1-1 1 1 1 1 11 1 11 =1 1 11 1 11 1 11 1 11 1 11 1 11 1 11 1 11 1 1 STAIR C LIFT fir' — 1 EMEWE111—I 1 1 1 1 1EI 11—I 11—I 11-1 1 1E111-111—I 1-1 1 1E1 1 1EI 11E 1 1 IllI 11I 1I 11-1 1 1-1 ill HI--H 1 1I 11I 11111I ill ill ill dllMV IIHIHIHIHIHIMMHIFWHIHIHIHHHIIHIIHIIHll — I1-111-1 l FL — I -11—I1-111E111E1 - - - - - 11-111-11 BOH CIRC BOH HEI I I=III=III=III=III=WEL IEI I I-III—III=III=III=WEL 1E111E111=11' 1 Ill 1111111111111111111E1111 ill ill ill IIIII111IIIIII= IHII-1IFHIFHIMIF II11IHIMIMIHIFHIF II5 115 11HIIEE WC ► K 11�III1111111IIIIIIIIIIIll1I1IIIIIIIIIIIIIIIIIIIII-11 COLD DRY DISH / n - - - I-III-III-III-III-III-III-III-III-III-III-III-III-III-III-III-III --�-- - - 11 II II II II III III III III III II II III III III III III :� - � 1 I-III-III-III-III-III-III-III-III-III-III-III-111-III-III-III-III- IFIIFIII-III=III=11HIRIFIIlaIlaIlaIlaIlaIla aIlaI1=111 WC 1 _OA - -111-111-III-III-III-III-IIIEME111-111-I 11-I 1 -I 1 -I 1 -I 1 -I 1- KITCHEN11/ l IIIIIIIIIIIIIl-1 1-1 1-1 1 1-1 1I 1 I1 1 1 1 I-1 I1 1-1 1-1 1-1 1 • 1I11111111 Ill Ill 11111I1II1111111 1I1 1111111111I111 WC It N — — — 1 111—I 11—III—I I—I I I—I -1 I-111—III—III—I 11—I 1 I—III-1 1—I -1 I—III — _ —111—=ll II ill ill 11IIIIII—III—I 1 1M1 dll Ill 1IIIIIIIII111 __=u=_ --MC) 11 III—III—III—III—III—III—III—III—III—III—III—III—III—I I—I I—I —III ll IIII IIII Ill IIIIIII—IIIIIII ill IIII IIIIIIIIIII I I I 1—III11I I—III—III—III—III—III—III—III—III—III—III—III—III—III—I 11=111=1111 1 1 I111111I I EI LEI E 1E 1E 1=1 I ll 111E111E111E111E111E111E111E111E111E111E111E111E111-111— i �i —11-111—I 1 I-111E111E111E111111E111E111E111E111E111EMEH I1 III—III—III—III—III—III—III—III—III—III—III—III—III—III— 1' — __= WH 111E111EL I—L I-111E1 L—W—W-1WH H—M—M—WH 1 �H> _ -III—III—III—III—III— T ACCESS —III—III—III—III—III 1 1 11 1 1=1 111 1111 1= STORMWATER ill H — 11111 --- _ DETENTION TANK -111—I 1 —I 1 —I 1 I-1 1 I_ CONSERVATORY RESTAURANT =� - -I111 KI 111111 ��� -111=111111-111-111- -- -111ETi-1 -1r =111Ell rh -h Hl I M L-111E111E111=111-111-111-111-111E111-111- / — _ — 1=1 I I-I 1 I-I 1 I-I 11=111=11=11=111-11 H 1 H 1 H 11H 1=11=11 -I 11=111 ST, — — —(f) CIRC y ELEV I-1 11—I I �� 1—Ill 41 WC WC STORAGE T '�-L. \ — _LL 1 (B) II�• IIIII I vu�wclnnmr I1111111I111 MEETING RECEPTION II—Ill—I _ a I l—l—_ I + +I +r IIIIIt--""" - L 111I11 I il IIIIll1I I 111 '11- L I 1 1= I=IIIE Dit- ±-- o (A) 1 H I II 1 � -L H I I I 1 � l ici--L I I I I I I I --11i_ 1 � I I I H � T f M - , — — 1 1 'i-- I I TLEVEL 01 A-101 1/8"=V-0" © mosaic Lake Oswego First Street North Anchor 1 April20, 2021 IOTEL GROUP UD+P H AC K E R (iv (10) () (8) O (6) () (4) (3) (2-) (1) 1 T T T T T T - - -1 - - - - - - - - - - - - - - - - - - - - - r - - - - - - - - - - -1 - - - - - - - - - - 1 1 1 1 UP 10 •;i+ / LIFT h� #4'I=4 I STAIR I �I , 1-3 4-6 7-9 10-12 13-15 I6-16 1 III . - n BOH 19-21 22-24 25-27 28-30 31-33 34-36 — I TRASH PARKING STAGICRS - — — — 37 38 39 40-42 43-45 46-48 STORM WATE ACCESS - - - — (H) Y_ rrr CN \ / _ — _ PARKING — _ /G\ ACCESS CONS VATORY �`sk � \ l %1 U ELEV CFT' 1 —U \ i 4B \ 5U •■ - (p) — — VALET0 . \ — (C) I TRANS - - U LI L U - (A) - - - H - - - - - -h - - - - - -h - - - - - H - - - - - -H - - -h - - - - - - - - - - - - - - - - - - _1 I I I I I 1 1 1 1 1 LEVEL 1.5 A-102 1/8rr=1r Qir mosaic Lake Oswego First Street North Anchor 1 April20, 2021 II IOTEL GROUP UD+P HACKER (11) (10) (9) (8) (D (6—) * (4—) (i) (2—) (i) 1 1 1 T T T T 1 I I I I I 1 DIN 1 r I ,. , PI 1 , .. , , =WM MI= s • s • • • • • /// A02 •C — • / ii B12 / \ a • P/ • / • / • / gl:‘‘ , P 11 riL-1H •„ ICO r i • , • • /' b , t , r \ ' / 1= LIVING ROOM tl 1 IL] . , \ '., ., . _ \ A01 , . , . _ _ , . —10 , . , . , . \ / \ , . . . A01 , . . . . . , . . . . . . : \ , . / N CONSERVATORY 5._a.. P V 1 2 . . . . . . , . . . . . —...— ,. . . . , . . , . . , . . / A01 1 . . , . . . . , . . . , . , . . . , . . , \ ss . s 2..=E 1 ,, \ u,u d CIRC ELEV '-- \\ 11 I A01. 1 — , \ . \ . N U S IL] , (0) 1 (c—) , LI D -El 13, 1E I 12r A01 — — (B) I .Th 1 D ill 1 1 a "El a 12r IPHI-1 T--------1 B01 B01 B01 B01 B01 B01 d=IL]11 1 \L ILI All _ . . . . . — — (A) _ _ . 1 1 1 1 1 1 1 1 1 1 1 I I I I I I I LEVEL 02 A-103 1/8"=1'-0" mosaic Lake Oswego First Street North Anchor 1 April 20, 2021 II I OTEL GROUP Up+p HACKER (11) (10) ( ) (8) ( ) (6) ( ) (4) (3) (2) (i) T 1 T T T T 1 I 1 1 1 1 1 L 1. P A02 A02 A02 PI ig. g g cc DE) A02 ribr 7 11 (111). A02 1 1-- 14\ —1 r11D 11 1 ; 7 ID 15'-0" B12 ,"E YD n-7 11 In o `i' 1- • — - iC--) iC() — - —10 II _ 6 3/4" ' n) YOGA - B03 ,- ' Aoi - 1 — - —10 B03 CONSERVATORY 17 7:1 T FITNESS , , /' ' A01 - / , /6 EHEim j : , \ \ , , , „///' „ A01 (H) B03 „\ . / I ,"y, O:1 i )1 IFi I L, 5.-0" '"\ L] — - (G) B03 , 17 lo j), HOUSEKEEPING / n:I -1 / /''' ' s „ % , A01 — - ® :WH 1 , ELEV A01 • Do \__ .. . 1,147 ji z• Q 71 _ (D) . , cp 5.-°- • 1 11 1 ' ID 1,1-- clit5 cip j11=1),L a :1 . L] 1 - - (c) 4_1! L • (B-) E. c _ B02 '‘;, B02 B02 A01 ;N 1 A13 T B01 B01 ° 1±1 IL Al2 - —1 1 P '4 / _ : I 11. ,J - - (-) 12'-0" 1 i 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 LEVEL 03 A-104 1/8"=1-0" mosaic Lake Oswego First Street North Anchor 1 April 20, 2021 11 I OTEL GROUP UD+P HACKER _ (iv (io) ( ) (8) t (6) * (4) (i) (2-) (i) i 1 T T T T T I 1 1 1 1 1 . . _ co PI _ _ _ __, 7,_ _II_ MA i I r7:1Fa MIME 0!.iiN• E 7 A02 A02 A02 A02 A02 fo - a — .71 n-7 II B12 n-7 II7- ID I x1 P A CiE DD 11 (Li 11 CI E) 11 (---,,r) ri _ 00 , . . I ,,.._. „,.__ n i_ CONSERVATORY 0 Ill ' -a Li B03 17'-10 1/4" — — — I IT- B03 I\ MEETING / \ , II ' CO2 n 61„, , \B03 ,/ A15 I ,, — - — 4.-V' B03 (6) HOUSEKEEPING , , - F / \ 11 . / , F , , \ 7 7 0 ,,„11 _, „., j) / . l‘ficti ELEV / \ _ A14 CIRC (D).. _1...' , • Do L CND .]Q1- — - (c) 13 E 11 1) Cr•ID 1 1 t I ] •_II L • 1 _12 LI_ — - (B) A16 II p B13 A03 A03 7 A03 IL 1 1 co, `•,-.1" •--,,, rl- 1 - 11 I , I I 1 I 1 I 1 1 I I 1 1 1 1 1 1 LEVEL 04 A-105 1/8"=l'-0" mosaic Lake Oswego First Street North Anchor 1 April 20, 2021 11 I OTEL GROUP Up+p HACKER (11) (10) () (8) (7) (6) () (4) (3) (2) (1) T T T T T T T T 1 1 1 1 1 —I o 1 • io HOUSEKEEP G C04 7LI ( IL C04 B04il T Q1414I - - —10 ol nI[h l • . ., , 0 III . C04 I[hlnl - - (H) \L Boa C04 "—I1 cIllid t 1 Ill % CIRC — STAIR 4 1 ® ELEV MECH — - (C) ROOF DECK (B) I I I its io I I 1 I I I 1 1 I H LEVEL 05l' mosaic Lake Oswego First Street North Anchor 1 April 20, 2021 IIIOTEL GROUP UD+P HACKER 1. Fifth floor rooms 2. Elevator expressed as chimney 3. Stucco chimney 4. Wood frame windows 5. Stucco exterior on'Mountain' 6. Balcony 7. Entrance Arch 8. Southwest Egress Stair 9. Northwest Egress Stair Beyond 1 10.Parking Garage Entrance 11.Trash 9 12.Parking Ventilation Maximum height I, 2 slopes up towards north 60'-0"Maximum Height 8 ■ 3 !!! 4 7 6 6 • Alley IF 11 11 11 I 11 11 11 11 11 111 I \\ Continuous Material on'Mountain' / Stone Base 7 1st Street 0'-0"Maximum Height Base Point LONA Hotel SOUTH ELEVATION Scale:0'-1"= 10'-0" mosaic Lake Oswego First Street North Anchor April 20, 2021 p IOTEL GROUP UD+P HACKER 1. Fifth floor rooms 2. Elevator expressed as chimney 3. Stucco chimney 4. Wood frame windows 5. Stucco exterior on'Mountain' 6. Balcony Maximum Height Measured from Site Slope —Maximum Height Measured from Parking 7. Entrance Arch 8. Southwest Egress Stair 9. Northwest Egress Stair Beyond - - 10. Parking Garage Entrance 11.Trash 12. Parking Ventilation 2 i � 1 3 60'-0" Maximum Height 6 5 4 6 Continuous Material on 111 111 11 11 11 11 11 11 111 111 111 �� I 11 111 111 111 111 111 'Mountain' Stone Base 7 0'-0"Maximum Height Base Point 0'-0"Maximum Height Base Point at Parkin 9 9 9 LONA Hotel EAST ELEVATION Scale:0'-1"= 10'-0" Lake Oswego First Street North Anchor April20, 2021 Emosaic IOTEL GROUP UD+P HACKER 1. Fifth floorce rooms 2. Elevator expressed as chimney 3. Stucco chimney 4. Wood frame windows Maximum Height Measured from Parking 5. Stucco exterior on`Mountain' . Balcony tran 8. Southwest Egress Stair 9.76. Northwest Egress Stair Beyond 10. Parking Garage Entrance 11.Trash !=L11 1 9 3 60'-0" - - Maximum A Height 4 Parking Garage 0'-0"Maximum Height Base Point 0'-0" Maximum Height Base Point LONA Hotel NORTH ELEVATION Scale:0'-1"= 10'-0" Lake Oswego First Street North Anchor April20, 2021 Emosaic IOTEL GROUP UD+P HACKER 1. Fifth floor rooms 2. Elevator expressed as chimney 3. Stucco chimney 4. Wood frame windows Maximum Height Measured from Parking Maximum Height Measured from Site Slope 5. Stucco exterior on`Mountain' 6. Balcony 7. Entrance Arch 8. Southwest Egress Stair 9. Northwest Egress Stair Beyond 10. Parking Garage Entrance 11.Trash 1 2 60'-0" 6 3 Maximum Height 9 8 6 I II II II I I II II II I I II II II I I II II II I 6 Parking Garage 11 10 0'-0"Maximum Height Base Point 0'-0"Maximum Height Base Point LONA Hotel WEST ELEVATION Scale:0'-1"= 10'-0" Lake Oswego First Street North Anchor April 20, 2021 Emosaic IOTEL GROUP UD+P HACKER Lake Oswego First Street North Anchor April 20, 2021 P HACKER PARCELS B-C (MULTI-FAMILY) 1 Development Summary A B C D E F H I J K Unit Types Per Floor Structure/Ci Constr. Common/ Eff.% 1BR+D/ 1 BR+D/ 2BR+D/ TERRACE Floor F.A.R. Parking Retail iculation/ Balcony Res SF Units 1 BR/1BA 1BR/1.5BA Gross Amenity (D+J+K/B) 1 BA 1.5BA 1.5BA 1BR+D/2BA Service West Building 5th Floor 6,592 7,818 384 5,816 79.30% 5 0 0 1 0 0 4 4th Floor 13,062 13,494 432 10,990 84.65% 13 5 1 2 1 1 3 3rd Floor 13,251 13,539 288 11,200 84.85% 14 7 1 1 1 4 0 end Floor 13,251 13,539 1,679 288 9,378 71.39% 11 5 0 1 1 4 0 West Above-Grade 46,156 48,390 0 0 0 1,679 1,008 37,384 79.34% 43 17 2 5 3 9 7 'arking Level 2(And Ground Flr Retail) 6,345 16,409 10,064 3,506 941 21.37% 40% 5% 12% 7% 21% 16% Parking Level 1 0 13,753 13,266 0.00% West Bldg Sub-Total 52,501 78,552 23,33o 3,506 0 2,620 1,008 37,384 53.34% East Building • 4th Floor 7,740 8,124 384 6,617 86.18% 8 0 0 4 4 0 0 3rd Floor 7,980 8,124 144 6,747 84.82% 9 1 2 3 3 0 0 end Floor 7,980 8,124 144 6,747 84.82% 9 1 2 3 3 0 0 l.o East Above-Grade 23,70o 24,372 0 0 0 0 672 20,111 85.27% 26 2 4 10 10 0 0 Stackers Pit 0 1,748 1,748 0.00% 8% 15% 38% 38% O% 0% 1st Floor(Parking) 4,555 10,251 5,696 2,558 489 24.95% East Bldg Sub-Total 28,255 36,371 7,444 2,558 0 489 672 20,111 64.17% COMBINED TOTAL 1 80,7561 114,923 30,774 6,064 0 3,109 1,68o 57,495 56.77% 69 19 6 15 13 9 7 I 28% I 9%I I 41% II 23% ZONING REQUIRED AREAS (EC,DRDD ) Req'd Provided PARKING STALLS Qty. AVERAGE UNF Tot.Area sf Avt.Sf Total site area 30,000 sf West Parcel 18000 sf West Build: P1. 38 Studio - East Parcel 12000 sf West Build:P2 24 Micro 1BR - Maximum F.A.R.(3:1) 90,000 sf 80,756 sf East Build: 1BR/1BA - West Parcel 54000 sf 52,501 sf East w/Stackers 29 East Parcel 3600o sf 28,255 sf Max. Building Coverage(100%) 30,000 sf 24,004 sf Total 91 1BR+D(Sm) - 1 BR+D(Md) - 1BR+D(Lg) - 2BR/2BA - Blended Avg. 833 sf Lake Oswego First Street North Anchor I March 25, 2021 Li -1FP HACKER LAKE OSWEGO CHARACTER 1 - d ,) stry, Con- T ty Recreation / Iror' , Wood , Water ... - , , ,,,.,. r ••,.., I, jr N , ,... , . i2 14, .- .•..''''' . f Al. ' , 1 , ,,. .. ...,, +1., 4, P. .* *:14 '''.;X. '-' "- - ." :N',' ';' 'r'‘'''''',Vnt':'.2 •`A.-.- ' 4 :.... , J:Y- ',. g', : . ,;,,.1, .-C,414 . ; j*,•;44...:€7,14N, itrig ,..i. _ 1: k?..,,,-.. • 2..,--1- ;"!, :aa .-,', 1• 406.., • , I 's, . if.. . , ....Pillill" y- L 1 I ..r. .e. • - ..,m.. . . ., ''„ ' ' .' •? -41 .4. '''' •. ', ''. . ,,Z., ' .1k1 . il. ... .. . 4 ,;*,,,.,__,,______.,, ' , 7{.::".i t ..,..'• 1 -. ---7- ---"mlin—7.:;1'7" -...A . f - ---' 1' --f-L. I' t 1 ', ...— .-fti -r-, ••' Y ' ' igit,„!„---. -_-__.-,..--,:-- ,.„-- --._„..-_-,----„,-::, k ' ' la. 131,:i411rdirl --.. 1.1 '.... 1" 1 A • -AVII-qr1- . ..., — -- . _y si - -,..-.-- - 4 . - .,,•---°.. . -- — r -a—,_`•,.. '...'. 1 -------11—----- 4*.S. ."..' d , _ 401.11F-Z-= ----',77.— •d—.—,—._.__,,-CI '..r.r'----- - .'.1 I .,,, - - ,. _ _ _. it _.:_i -k- -- .. I•i -.....,-., . Z N44..11111141k4,4111 t.. _,:- ,_ - . ____. . .- - , , ..' ' „ :!...,..:;', - - _ / _ .6.1--', -• ,_ _ -- • • , - ti'll ix' _ V --1.411‘ . . ___ • i ri,',. -&- - • ,. . • , e'Mfg A . ......-- . ._ ---- 1:11°1-1- .. .. „ , •••• *i - . e ir '- ._ - „..., ''. '-'.- _,,- . ..., ir--;• sl....0,•'' ..___ 7k7a— :41--,-46 ......-:,-.9i."„49 _.‘,,,,..7,,, , " ).• . ,s00.. .4.1 . 'Al. 146 . _ I ''' --:1 - ii 4 k__ .a.F.-";;;;..r .741.9- le ' 4111‘'t• % ' 7 i 111?.4 1 irli .1. ' * 1011' t 0.. ' .,da a4 Fa . i .1 j Li" ?''''( ' ' ' lk-Ni' ' 3 • .. ' ..) ' ' - •- • ' 4 „. rjr- . . , /. / 1.//,///0 1 !I j ,r.,_ . It -9... ...ni=rti:•.ii41,...,41 , 111., .....„. /spit i• _..., ,,1,"17 ' -•,ne2. -.E.r it' .e. I, .1 _ b i p 4' , ,.. __ ., -irir. ... . s.' ) - i - I ) r 'aiiiiiiL—':INIPM7 1 , ..,-..ip-j..---i,4.-: •:' z-s•'• 7 ---•;.--_, • ..._ — ../ ' , k ."' • , ! I 1 1 - - -`. ' • a dd aa i y• . - / -=• ' '-r- ' ...1,rsi .J1,ft .pe • " --2.-------- is- •.- -- , ". •• ., - • '• ,,,'' ! - •::, .. • hil . _ A • l - - _ .. ' _ - _ -1,••• . 4,.. ..., ,.__.- --, ,. - • 1 —.0.. 'tilt- - - a'-- r-.--' = '— . -.7..- _.• • :,-J5 ....., . I -. - et. -- , • _ ••• l• , 74-:-1-, :;,.-- •it, .: r- ,..., , • - •r44,-," . --,-- , , ..,.....Iiii• _, • , • , N• - - . .. -' ..• - ,ar, . ....L, _e . 1-% I 0- . 7--- . 1,,r. miti.3—...-- ,... , .. %., . . . itilit . • .14 4... , ,. . . • ) ..44 10 iiti .. . 1 . _ , . ( 13 ! • 11 . -. 1111 ..-.7.•_. i . • _ __• • _ -_ — __ _ ___ _ _____ _ . . , $ . , _ _.... „-- __ ._.--_______ __ _ _ .. .. - „_ . ' -- ... , ... .__ 4 ' — ---1-•- -". , —_. .LI, I.1 - A L LI .1%1 er- . , .. - - . . • - -.4-"... r--.-.% ..•-..-- .c.,...--.. -• . _ 4 - - _ dr' • --- :_ _ • - 'll..,i.- IN• .. , -/_,.. . _, , ,.....,- , . _ ......_ . _ - ., - - - . ...,4c.: -. ____ _ .. ...... ____-.. ---,....„..._ ,. ._.-- • _ • . . _ ... _ ..._... • ., .,__..• - -._-.L.--.,ip ... • - • •.......,3 ... V....4 1 .4 01/4 • •'..-.-zt-., . . - • • . :..*t..."1 . r• .. ' . e . . - - , • ' Lake Oswego First Street North Anchor April 20, 2021 U-D+P HACKER OREGON RUSTIC STYLE Simplicity, Utility, and Beauty PER 50.11.001 APPENDIX A LAKE OSWEGO STYLE ADDTIONAL OBSERVATIONS ** • Moderately pitched and gabled roofs • An `early modern style' which emerged from the Arts and Crafts style, and influenced by National Park style, and Great Camp architecture of the • Large stone chimneys Adirondacks • Asymmetrical composition • Strived for simplicity, utility, and beauty • Numerous small windows with many panes and simple, undecorated frames. Dormer windows • Authentic expression of plan and structure • Log construction, unpeeled logs or half-round logs applied as siding; board • Emphasis on home life and connection to nature and batten or shingle siding left unpainted; natural materials such as river • Rejected superfluous decoration and replaced it with simplified, functional boulders or rough stone in foundations or as siding in first-floor levels. beauty. • Handcrafted rustic decorative elements. **Clark& City of Albany. (1983) Architecture Oregon Style. Portland, Oregon. Professional Book Center, Inc. Lake Oswego First Street North Anchor April 20, 2021 U P HACKER MULTIFAMILY 1 AeriaL view ^nor- Est a — d B Ave . 1 1 Mk :I , • It iv.s' li it I/ tflSot - IA I .,w 1 �" r - ,' fk� ill 4 1 - . . • , , '$ .j..... 1 I II r'RI -- ill . I i I: i in. _ i I i i I —� "re r + 04111 , . T1 , 1, . ._ : . ' — ' -;tr.., I '• 1 IN4]. I 1 ..... , , • I P.. , . ....... , , . r, --;,_ ---_,. , -, --. - .. . ,_: _ „.........-_. . , .. .Vr ' 4- �� -►4,,. Tye tti ■ - _ _ - •.r .� - - 4 4 is - I 1 I ..'. ilitY,..•,.. ic_ .. p.,—.. .. "--.._..-,...•-•...._:__-__:-..ci.--%-.--....„• t.411-1 •_ > Y . DI - -,... .._,,,...„4 - . _....... ..... il., -6 . .• 'k 0 ' Z.): ' Iv - .iMt.r. •-••••,1 --- .- 4 4, ti $.y Af' ily I , 4 . , .,1 '''',./. . ' _ - :,°11r:::tr. e , . ...Jo.•. ---,_ 61*Ili ' "A j. -'I' ' 't I ji '.*': )4 e k . ey 0 -eztt - N ;,, ___. ‘--;44 agog . ,.4 iiiiir - 4. — ''. . _ . _.,._ •. . -5, _ 11ti. 0.-1-1 I '4411%11:.'11.1 441 1:11'11.-1..1.1..W A.' A. 'b'' ' "'I'1- • ' •...4,1/A-l't,1„',•', +r f' J i, )7' 4 :� _ k' 1 lir" lii•C : t ; •itt t t, il,, ; ti: ;1.3 ti •i+ 4 ;i� yf�4 r Lake Oswego First Street North Anchor April 20, 2021 LJ P HACKER MULTIFAMILY 1 AeriaL view ^rom Est a - d B Ave . DRDD ELEMENTS 1 2 3 , 4 5 6 7 8 1 STEPPING MASSING 2 VERTICAL STAINED WOOD SIDING 3 VERTICAL FIBER CEMENT SIDING 4 MASONRY BASE v 5 ARTICULATED ROOFLINE AND ill 1 , I FACADE (Or 1 i 11 If II I T r- v _ GROUND FLOOR CORNICE 1, 1 ��4 �" COMPLEX MASSING, SITING/ I. a � _, v 8 Iry `fit „2,.., ! �� DIFFERENTIATED FACADES . .„ , , -::_.- •: --.: -'. 7 , . , " 'i - III It" til I 1 . 4 _ ��_r : , i OREGON RUSTIC ELEMENTS - ' , .r: :),Tip...71: :.,-,LIr j ,: _ r,.. 1, , ,,. _ -� �, -.. » S 1 ASYMMETRICAL COMPOSITION - ,.., 7.; - : . .,' 'l r2 � , ;„- `` ,. 1 MODERATELY PITCHED ROOFS igi4 MASONRY BASE - 6 WINDOWS OF VARIED SIZE AND OPERABILITY 1 Lake Oswego First Street North Anchor April 20, 2021 IL P HACKER PARCELS B-C (MULTI-FAMILY) 1 3uilcing Plans ,,_ 1 J \ r j 80' —0" — PARCEL B: 119' — 10 5/16" 20' —0" PARCEL C: 120' — 1 1/32"j / i' '/ er ,. ,,,_ _,_ 1 (N) UTILITIES @ALLEY REQ'D TO BE UNDERGROUNDED PER LOC 50.06.008 /////////////////////////////N I a ' (E) UTILITIES BENEATH ALLEY REF.ATTACHED SURV-Y .O , /I — , -- r-') I— —I 4 , __,2 1 , 1 1 .. 0 .,1 L MJ1 """ ,__ , 1 / LLJ Cr'-::l' 7 / __ W __ ____, , Lu ____ ,.,,, __ . ._______-_ ,_ „,, , cL __ , 1 ,„ H / _ _ = . _ _ ,_, „ >_ , , Lu (..r) \ / 1 O' Q C C' / \-1 jr1 MI mm / /4° .= - ' 1 1 , ----. H __ __ mm I L / Q 1 — / .- ----'''' v- m. Emm Emm � , ■__ i . , ,-. ,l, -,r. ', ,q A (I-1 f: - I ''. I -j l I i y O / - - y CI SW B AVENUE o II ) i d'\ \/ OSITE PLAN - Multi Family O 1" = 30'-0" SITE PLAN - MULTI-FAMILY Lake Oswego First Street North Anchor 1 April 20, 2021 UL P HACKER PARCELS B-C (MULTI-FAMILY) 1 3uilcing Plans 1 20 3 4 5 (10) (1 1) (12) (13) (14) (15) 119' -10" 20'-0" 116'- 1" ir //' =1 imm - 1 1 O — STANDARD STANDARD — STANDARD — STANDARD — — — — — — — I r H PARKING LEVEL 02 124'-9" GARAGE ENTRY (26+VAN) u / / N ED — — - — — 1I — — 1 ART WALL rH PV \‘, \ in �t � 1 a - aSTANDARD(TANDEM) I:: I 1 O O p STANDARD COMBILIFT8x3 W/PIT r / V (23 SPOTS) / ° G G ill 17 MECH. [ 11T-7" - PARKING o 0 0 1 I LOPE 5% 13+VAN i I I N 28+VAN (WITH STACKERS) \ 1 Tr>— 7 \ -- — — \- r MECH >- ❑ j , o X LOBBY/ MAIL Q I `^ STANDARD ci it W/c w/c MECH LOBBY/ MAL o / , IIIIIII 7 Him — � N - IIIIII LLI 1 W/C Lc W/C W/C W/C �� 1 / =1 1 i'1 �t .`... W�, �� 124'-9" 1 SHARED ` ' RETAIL F-1 1 1 00! . — N � _ E 4�L - _ RETAIL RETAIL LE 7 rEIL, CGD �\ \ -___A-!�c1�-r V i 1 r-'__'7 1 lit -1—I ! � I\/ 1 I...., , �-- - p,+� &,--1 1-- —I I� �/ �\ o a 2 -T 1 I —I I �`('1�'� m /� / 53'-6" 7'-0"/ 59'-4" 1 �� / '-7" 27 -0 / 34 -G 9 8 35'-0" 0" 11' 0" iii piee ,I� 1 4 i i CBUILDING B & C - PARKING LEVEL 2 ;h 3/64" = 1'-0" Lake Oswego First Street North Anchor 1 April 20, 2021 UD+P HACKER PARCELS B-C (MULTI-FAMILY) 1 Builcing Plans 20 3 I 4 5 (1 0) (1 1) (12) (1 3) (14) (15) PARCEL B: 119' - 10" 20' -0" PARCEL C: 120'- 1" / I 1 / I I/ / 30' -0" 59' - 11" 30'-0" 1 i \ / inOig ••• ••• \ 7 -7 - STANDARD STANDARD STANDARD STANDARD N t- . 0 o PARKING (36-38 SPOTS) N N 85'-2" 1 COMPACT a a S-ANDARD(TANDEM) ; / ' 1 c-I a 1 , • CoL o o 0 /' ,' i PIT FOR COMBILIFT SYSTEM l ' 0 I. , I N r' r, a 21' - 10" , ; ' ) O a /e / u LOW HEAD RM 1 j M g ti / ,\ 'I 1 j E N. 7 Ln 1, , , , , „ .\ .., bi III-7 ' 71- \ N HI , >1F > 'fs STANDARD STANDARD - - O ' r N ( i N N -- immii- 1 s, 1 \',TI — I' i •• 60' - 11" 20' - 1" 138' -10" ,�` I m/ I ?.. ,, , 1 I 1 mr E III 4 119 - 10 -----C\ 11711.- I I � I PARCEL B & C - PARKING LEVEL 1 W 3/64" = 1'-0" BUILDING PLANS Lake Oswego First Street North Anchor 1 April 20, 2021 1L)+P HACKER PARCELS B-C (MULTI-FAMILY) 1 3uilcing Plans 20 30 4 5 (10) (11) (12) (13) (14) (15) PARCEL B: 119' - 10" 20' -0" PARCEL C: 120' - 1" / / / /30'-0" 30' -0" 30' -0" 30' -0" 20' -0" 25'-9" 25' - 9" 13' -0" 25' - 9" 25'-9" / / 1/ / / /� / / / / I/ A - - 0 - I I I B —., II �, , - �, 1 — — — — — 1O 1BD+ 1BD 1BD 1BD+ 13' _ 4'_ __ 51' - 6 0" 51'-6 0" I-, j 750 SF 510 SF 510 SF 900 SF j /( / /� j/// I L [ • - 2BD/1.5B A - - - • ' - io 1,170 SF - 1 J. N LEASING 1BD+ I = r, T; s , 1000 SF \ _ - _ OFFICE N ?� I / \ / N _ D ` O _ g -- e --___ _ O1 I ,—_ ,--� / \ I / c a-I o 1 Tr ,-' slope 5% _- ---L LOWER / UPPER I / \ Ni -f-- LOBBY LOBBY/AMENITY I \ 1 STUDIO 1BD 1BD 1BD+ I� E _ —I— — — I __..=_ 580 SF 650 SF 580 SF 770 SF OII . = UP 1 "11BD/1.5BA+ 1D 00 2BD/2BA+ x Al - 885 SF 1,240 SF 1O 1 II I 1 I 1BD/1.5BA+ 1 \/ 1BD+ 1BD+ \/ 1BD/1.5BA+ � '� " II [ 810SF 735SF 710SF /� - 910SF r I 2BD/2BA+ M11111 1 1 1 1 1 E 1,290 SF — — 1� I 2BD/2BA+ 1BD 1BD —, ► '.iW "" .W 995SF 510SF 510SF - -.y.. .W 1 li Y . - °" I /''� I ,4 1 0 � / � LC:,,,}, I I PARCEL B�& �C - LEVEL 2 O1 _C9,,, 3/64 = 1 -0 BUILDING PLANS Lake Oswego First Street North Anchor 1 April 20, 2021 UD-I-P HACKER PARCELS B-C (MULTI-FAMILY) 1 3uilcing Plans 1 20 30 4 05 (10) (1 1) (12) (13) (14) (15) PARCEL B: 119' - 10" 20'-0" PARCEL C: 120' - 1" / I / / I I 1 / O \ -9,_5" - - - c110' -6" - - - / / / OB - - li 1BD+ 1BD 1BD 1BD+ 750 SF 510 SF 510 SF 900 SF [ 51'-6" 13'-0" 51' - 6" 4' -0" - - ' - r n_ Ln MI 2BD/1.5B A \ ‘., \ 1,040 SF - 1BD+ i 1000 SF 1BD I I o D - ` - -^- - "_ 605 S F - - I - - - - _� Tr N - 1BD STUDIO 1BD 1BD ;.-1--1 rfr 1BD+ ) ✓ O — =- - 520 SF 1BD j 580 SF 650 SF 580 SF 770 SF J 670 SF 1BD/1.5BA+ o Ty,1 2BD/2BA+ X L ILI 885 SF Q, 01 1 1,240 SF /J l r \ / / [ 1BD/1.5BA+ \/ 1BD+ 1BD+ w 1BD/1.5BA+ I I 810SF 735SF 710SF 910SF Ln 2BD/2BA+ 1 Illl / \ 11111 I1,195 SF I - 1 2BD/2BA+ 1BD 1BD -� L� 995 5F 510 SF 510 SF � 9 _ 1 1 - I�/ 1. r- (G - 0 N j_ 1 -..---_ in\ • AA CPARCEL B & C - LEVEL 3 V/ 1 3/64" = 1'-0" BUILDING PLANS Lake Oswego First Street North Anchor 1 April 20, 2021 U -1IT HACKER PARCELS B-C (MULTI-FAMILY) 1 Builcing Plans 20 3 4 5 (10) (11) (12) (13) (14) (15) PARCEL B: 119' - 10" 20'-0" PARCEL C: 120'- 1" / I / / / ---A__) I I I I ,,` 7'-5" 110' - 6" — — — — — — — — — / i( / Mr I 1BD+ 1BD 1BD 1BD+ 750 SF 1 510 SF 1 510 SF 900 SF 51' 6" 13' 0" 51' 6" 4' 0" I - Cr /( / / ,f/r Ln 1 11111111MMM� 2BD/1.5BA 1111111111 [ 1 •\ •\ L I1,040 SF ' 1BD+4 1000 S F I II E • 1BD — D . — -1 605 SF I( ;� 7 Q1\,_____y ,_, d- -, 1BD+ 1BD+ `V 820 SF 770 SF 1 — — - - — — -/ ( MEE. —=- _— CE I I 1BD —520 SF 1BD I 670 SF 1BD/1.5BA+ 1BD/1.5BA+ -, I 2BD/2BA+ X LII ' 840 SF 825 SF rn rn 1,050 SF )/ II 1BD/1.5BA+ \ / I 1BD/1.5BA+ 1BD+ 1BD+ ,' 785 SF 735 SF 710 SF 71- 1. 11 ' MM Ln 850 SF Ma [ 2BD/2BA+ 2BD/2BA+ 1,625 SF 1 I� ti c 1,450 SF 1 141-4_1-1- • �VJ — ip•-, ___. in\ \ PARCEL B & C - LEVEL 4 1 3/64" = 1'-0" BUILDING PLANS Lake Oswego First Street North Anchor 1 April 20, 2021 UID+P HACKER PARCELS B-C (MULTI-FAMILY) 1 3uilcing Plans PARCEL B: 119' - 10" 20' -0" PARCEL C: 120' - 1" / I / i/ / 119' - 10" /' _ I I I / I I 1 CA C — — — 1 1 2BD/2BA 2BD/2BA II 1,185 SF 1,230 SF i 2BD/2BA 2BD/2BA r \ 1,075 SF III 1,220 SF 0 � l N 2BD o 670 SF ! k `ICI ses - II s es { r-: eye a se es € N 1 ICI r IIII 1 t_� 11. II) 1111 1 11 1 o 40 •"ariwr�: .v y „� 1111 1II1 in sess - rn�iiiiiiiiiii= � IIII •.. :.. . . s es s 1 1111 III1 1 I miiiiii — e s e e nF — — e saes — — — _ s — Ln I Ir ..c.. r c a c. r r,<w oe0es1 � se ; u 1r z!e e s III II qII' ' = �� I1 IIII' �::� _ ; ..,,..,........M....,,.., :Esese s esi. 11 ' '41,,,I.,---: igi,,, i:::e0 1 0U0 (G) \. O PARCEL B & C - LEVEL 5 my 3/64" = 1I-01 BUILDING PLANS Lake Oswego First Street North Anchor 1 April 20, 2021 UD+P HACKER PARCELS B-C (MULTI-FAMILY) 1 Builcing Elevations yr.1 HEIGHT LIMIT LINE r /7 I A\ / ‘' 0,(1i i ;:�, ��� , eta -\ 47 Z./' I b: ' 'N./f\' ‘ '‘ >-) .1 , *AZT/ , B - LEVEL 5 -I I y\� !!!,1„,P' B - LEVEL 4 I _ 1 158 8 I - _ -- 1 I— B - LEVEL 3 � _ 1 148' - 4" o I r 1 I B - LEVEL2I it '' -_--- 4 i��i lI). l i l l l l 111 11 11 I I I(I I,iI� l i(µ�_ - : -, ,---r-- rrrr — p o l p U i I,i77T — ll/l l i t -- II 0 1 1 9 I 1 l i,i i i,i i i,i ir`i i ..i --'1k 7,,7-,I.--1-.717-`-17--1/r--17LT1k 7- II YY 138 - 0 _ i i1i _'i i--f u u, i � � �( I �� Ii � � � � Ii �` l :', , � 17 ,,,Ti 1 — 1 I I I I I i � i i I I I I I I I 1 1 1 1 1 1 1 i t i� r r� r� i 1 1 r 1 1 1 1 1 1 1 I l l l l I I I I I ` d_I 1. ■1 I I 1 = I I I I I I l l i ' I ; 1 c l /u{ ■= ... . I _ GARAGE ENTRY B - PARKING ■- _ 1 ` 1 ` 1 125' - 9° S ,� 1 1 �' ■ Ili � I I —i i-,r'`T„ I -- '-I 1 i T 1 1 r ' 7-il 111111 ISN-- iiii 'B 'BASEMENT PARKING - STAINED WOOD AT GABLE ENDS 115' - 9" PARKING FFE BEYOND CONCRETE AT GARAGE BUILDING B - EAST ELEVATION ARCH STONE BASE TYP. C 3/32" = 1'-0" BUILDING ELEVATIONS - PARCEL B Lake Oswego First Street North Anchor April 20, 2021 P HACKER PARCELS B-C (MULTI-FAMILY) 1 BuiLcing Elevations HEIGHT LIMIT LINE '\ ' )1 ;(' !:.:0VqT ' , ‘' ,', . ' /\ . - 4 FM '''HM45`4 f M K\'3;' :, 'P;' .;/'\'/ fr..A;A. .1 U,'lx5.')X.\/'W?/:q: :A/, . [.. W;', :. / 1S; i�e. � > ,1,' M .l�r'(< S �<C; ' .“jC. ,;1(i ;(, <,,x� S;/�� (��1 /:, ;(�. ' .i3O, /. �, ` C�( , •(''':( ‘ ,, ()/, '; ' '' ;A: '��r � (< i ''(1 iff ' \\,/,. ] . . �= B - LEVEL 5 ILA 1 L �' _ 11 B - LEVEL 4 S_ 7 , , - 158' - 8" . t • B — LEVEL 3 A =- �° 148 4 I 1 E. _ . 11 . . , B - LEVEL 2 138 0 B - PARKING LEVEL 2 FIBER CEMENT SIDING TYP 124' - 9" ESTIMATED LINE OF NEIGHBORING B - PARKING BUILDING LEVEL 1 115' - 4" PARKING FFE BEYOND CONCRETE RETAINING WALL BUILDING B - NORTH ELEVATION 1 3/32" = 1'-0" BUILDING ELEVATIONS - PARCEL B Lake Oswego First Street North Anchor April 20, 2021 P HACKER PARCELS B-C (MULTI-FAMILY) 1 3uilcing Elevations HEIGHT LIMIT LINE ___ - - - --___ I� - \.‘5i:./opI , T, J r:'.. '.\'//,q ;pW i jik B - LEVELS ' \ \S'� ' , /S\.__ ;S\S S\S�C< ' p CS' ''P31 NI:\ r'.': ) r . 1 . • . , \ \ \ 'S\ \ r i i i 1 - � i j � r r r r r� • 'la 0,.,'\,//0.:.•.. . /.•./ ! 1 " 1 , F 1 ' I I ,I 1 / I 1 , 1Ih ' fmr 169 - p 5 � �. , � , W -.p; . -: , i. . : / ! .p \r � ,r r 1 I � �1 � t, ll r (, i 1 1(‘I III il c � � � 0 B - LEVEL 4 Ih 1 158 - 8 - - - �. -_ . 1 f B - LEVEL 3 I I= - o - - , 148' - 4" - I 7 DUfl T - , B - LEVEL2 _ ,i I 138' - 0" - -_ , , r I - . 1- 'I■...__ B - PARKING it IH - - LEVEL 2 m .Tfm, -r. 124 - 9 err ,4 - B - PARKING FIBER CEMENT SIDING -- J i � LEVEL 1 -0 115' - 4" RETAIL FFE BEYOND ---- RETAIL STONE BASE TYP ----- BUILDING B - SOUTH ELEVATION J 3/32" = 1'-0" BUILDING ELEVATIONS - PARCEL B Lake Oswego First Street North Anchor 1 April 20, 2021 P HACKER PARCELS B-C (MULTI-FAMILY) 1 3uilcing Elevations HEIGHT LIMIT LINE 1 _ • /S f,\ /\ NI . r4 --///' . � / \\t':: . I ,,,,,,,, H..,...,, ,.,;,-- \ '4\ \II B - LEVEL 5 1 • • / � 169' - 0" ,-/<; ' ' 11,1 ///, --/ ).\ DV _ 7 =\\i'l B - LEVEL 4 mn® - - =- — - -• - . J 158 - 8 I J 1 _ 1.p - �- . ,- -- = _ _ _ B - LEVEL 3 B - LEVEL 2 DVI -. - - -- 138' _ �� LEVEL 1 .5 (Lo bt , b . I "~� - B - PARKING - -_ - LEVEL 2 AL '124' '9 B - PARKING STAINED WOOD SIDING AT GABLE ENDS LEVEL 1 Ali 115' - 4" PARKING FFE BEYOND CBUILDING B - WEST ELEVATION RETAIL STONE BASE TYP -- - 3/32 = 1'-0" BUILDING ELEVATIONS - PARCEL B Lake Oswego First Street North Anchor 1 April 20, 2021 P HACKER PARCELS B-C (MULTI-FAMILY) 1 3uilcing Elevations 44' _,41 _ 57' + _ — — — _ — _ — — — _ , _ _ _ -- _ _ _ _ _ _ HEIGHT LIMIT LINE 0 (/. , ('///tr/ !j. JJ '( `V',7( `!.'1,/1[7, Q (� -'- ,�. . . • -- • H C - LEVEL 4 a. 152' - 9" 1 C - LEVEL 3 142 - 5 L 1 C - LEVEL 2 _ i 132' - 1" .DI , ) a • ( l rit (• ,r1 ) ( l ) r rl ( ' ART SCREEN WALL - '''''''''':''''''''''' T''''''''''. . . .1. . . . . '1 / PARKING FFE BEYOND . . . -ti:::'::i::.1:::.::1.:::-; .. .:•:::::'•:.El:ir.'":::.:' : • • . . . . : ''•: . (/ ARCH STONE VENEER ir 7..:_.:: ; `: " �� C - PARKING � 117' - 7" i ti.._ - . ..) :. . ..i . x , - C - LEVEL 1 111' - 0" - BUILDING C - EAST ELEVATION -1% 3/32" = 1'-Orr BUILDING ELEVATIONS - PARCEL C Lake Oswego First Street North Anchor 1 April 20, 2021 P HACKER PARCELS B-C (MULTI-FAMILY) 1 3uilcing Elevations 57' 56' 49' 56' 54� ..- --ri 1 • _i 1 • 0 HEIGHT LIMIT LINE — — — — r — — — /\ ./\ / \ ''h.'' . 1 \ - // )\\ / •• • \ I \ (. / / ' .1 \ / 1 1\ • / .\ C - LEVEL 4 ��- 1 I �� - 152' 9 - C - LEVEL 3 1 142 - 5 i I M■ - 1 11 1i 1 I I C - LEVEL2 I ‘1,-- 132' - 1" 1 A aik C - PARKING , _ .7, e-- 117' - 7" -0 C - TuEL 1 I 111 � CONCRETE RETAINING WALL ESTIMATED LINE OF NEIGHBORING BUILDING BUILDING C - NORTH ELEVATION PARKING FFE BEYOND 3/32" = 1I-0 BUILDING ELEVATIONS - PARCEL C Lake Oswego First Street North Anchor 1 April 20, 2021 U iIrp HACKER PARCELS B-C (MULTI-FAMILY) 1 3uilcing Elevations ._... .-- L - HEIGHT LIMIT LINE :.:..: .... .. _.-n. .yes ' II //://\\\\\\ / / -/\\\//' .. \ / ' /'/ \\\\z ' //. 1 :.. / \ 1 C - LEVEL 4 S_ _IV l. . . . .. l _. I I� _ _ - l _.. . . II152' - 9" 111 1- I C - LEVEL 3 L_ _ I___ I 1L_ _ ._ L _ _ � ■ • •• 142 - 5 1 _1 1. . - __, C - EL 2- : -1 p 132' - 1" ' _I --I :I ! . ! . . I ' f L.._ ' . ' . i I . tl - Ii ,.f , 1 ..1 ' I' . . . . . . . . . . . . !!!ru `1 __.L I ' ...._ I I I I : I I ------ .,-; .7 -n, .. i •- .- I �� - - :�� IL I - PARKING sir! - 7 - 7 I -_ i .... I.._________1r'-'� /'.... _.. - r!!!.!!!!! I 1 -_, - • !!!!!!..-- , -.R. 0 - LEVEL 1 -111' =0" STAINED WOOD AT GABLE ENDS - RETAIL FFE BEYOND -- BUILDING C - SOUTH ELEVATION RETAIL STONE BASE TYP -- - C 3/32" = 1'-0" BUILDING ELEVATIONS - PARCEL C Lake Oswego First Street North Anchor 1 April 20, 2021 P HACKER PARCELS B-C (MULTI-FAMILY) 1 Builcing Elevations , HEIGHT LIMIT LINE L 'M' sV ! ". ' !i \ \ V A \ V A Vg�V ' . '\ l'\/<: V A A \� \ • > :*\,,' \ , . k, \ . r _.? \ . \ . /) > \< . . . \ . . \ './/\A ! : ! :. T‹ ` : t I I ' ; 'A ' 1` 'N& ` : ' ' \7.,/.\ . r,\\\\�r,\\\ /A ' r; .r, / .)X M i \� \,r,\\\,r,�\\\\ �rrr, r,\�r.v.vr,\\� r, C - LEVEL 4 I 152' - 9" I- 0 1O I. C - LEVEL 3 . _ 142 5 • :.:::•:•• •• , , \ I —J C - LEVEL 2 132' - 1" � GARAGE ENTRY /117111 C - PARKING Ak ...ram.... 117' - 7" FIBER CEMENT SIDING TYP C - LEVEL 1 111' - 0" RETAIL FFE BEYOND RETAIL STONE BASE TYP - - BUILDING C - WEST ELEVATION J 3/32" = 1'-o" BUILDING ELEVATIONS - PARCEL C Lake Oswego First Street North Anchor April 20, 2021 P HACKER