Loading...
Agenda Packet - 2011-06-27 PM AGENDA CITY OF LAKE OSWEGO LAKE OSWEGO 380 AAvenue Centennial 1910-2010 PLANNING COMMISSION MEETING PO Box 369 Monday, June 27, 2011 Lake Oswego,OR 97034 6:30 p.m. 503-635-0290 www.ci.oswego.or.us/plan City Hall - Council Chamber Contact: Iris McCaleb Also published on the Internet at: Email: imccaleb@ci.oswego.or.us www.ci.oswego.or.us/plan/planning_commission Phone: 503-697-6591 The meeting location is accessible to persons with disabilities. To request accommodations, please contact Iris McCaleb at 503-697-6591, 48 hours before the meeting. Note: Prior to the Planning Commission meeting: Monday, June 27, 2011 5:30 p.m. FOOTHILLS DISTRICT SITE TOUR The Planning Commission will go on a tour of the Foothills District led by Brant Williams, Director, Economic and Capital Development Department. The starting location will be in the parking lot of Foothills Park, 199 Foothills Drive, at 5:30 p.m. Although the site tour is not a "public meeting" under ORS 192.610(5), the public is welcome to join the Commission members on this walking tour. The Commission anticipates that the tour will last approximately 45 minutes. 1. CALL TO ORDER (6:30 p.m.) 2. ROLL CALL 3. CITIZEN COMMENT— Regarding Issues Not On the Agenda (3 minute limit per individual) This is an opportunity to raise issues regarding Planning or Citizen Involvement. 4. COUNCIL UPDATE 5. WORK SESSIONS 5.1 Foothills District (PP 11-0003) Update on Concept Plan and discussion of site tour. Staff coordinator is Brant Williams, Director, Economic and Capital Development Department. (Continued on Other Side) Jon Gustafson, Chair • Lynne Paretchan,Vice Chair Puja Bhutani • Julia Glisson • Jim Johnson • Russell Jones • Todd Prager • Jeff Gudman, Council Liaison Page 2 5.2 Design Handbooks for Lake Grove Village Center & Infill (PP 10-0017) Presentation and discussion of consultant drafts for both handbooks. Staff coordinator is Johanna Hastay, Associate Planner. 5.3 Transportation Systems Plan (PP 10-0016) Update on request for proposal and schedule. Staff coordinator is Laura Weigel, Associate Planner. 6. OTHER BUSINESS— PLANNING COMMISSION 7. OTHER BUSINESS—COMMISSION FOR CITIZEN INVOLVEMENT 8. SCHEDULE REVIEW 9. ADJOURNMENT of LAKE Os\vEGo Foothills District Framework Plan BACKGROUND and FAQ's O R E O N Project Background The Foothills District is envisioned as Lake Oswego's next great neighborhood.The 107 acre district sits between downtown Lake Oswego and the Willamette River, and provides a unique opportunity to connect downtown with its public waterfront—Foothills Park, Roehr Park, and Tryon Cove. Over time, the district can be redeveloped in a manner that retains Lake Oswego's unique character and is complementary to its emerging Downtown. In order to establish a viable vision for the Foothills District and move redevelopment efforts in the area from dream to reality, the City began working with a group of industrial property owners beginning in 2003 to identify the planning issues present in the District and to explore potential approaches to District redevelopment. In late 2008,the owners hired a Development Manager—Williams, Dame & White ("WDW")to assist them in their efforts, and together the Owners and WDW worked with the City to establish a Predevelopment Agreement to kick start planning efforts in the District. An initial Vision Booklet was prepared to provide a broad vision for the direction of Foothills and to generate discussion about redevelopment opportunities. On June 15, 2010,the Lake Oswego City Council approved a Predevelopment Agreement with Foothills Road Redevelopment LLC and Williams, Dame &White—Lake Oswego LLC.The Predevelopment Agreement calls for the creation of a Framework Plan for the 107 acre Foothills District, consistent with the Planning Principles adopted by City Council. At the end of this process,the correct regulatory tools will be in place to allow for redevelopment in the district to proceed, consistent with the vision approved by the City Council. The Predevelopment Agreement includes a detailed Work Plan, Schedule and Budget that will guide the work of the project team, and work products are clearly identified. As part of the overall work,the project team, led by WDW, will pursue a meaningful public involvement strategy that will incorporate or address community ideas, issues, and concerns related to the project. Frequently Asked Questions What is the goal of the project? Why do the plan now? The primary goal of the Foothills District Framework Plan is to establish a broadly supported vision for redevelopment of the District and to put in place the regulatory elements that are necessary in order to implement that vision. At the end of this process,the City envisions that the District will be "shovel- ready"for development—in other words,there should be no regulatory impediment to development and, economic conditions allowing, a property owner or developer should be able to immediately begin the development process. The importance of doing this work now cannot be understated. Until and unless some of the significant development barriers are removed—such as industrial zoning, floodplain designations, or lack of adequate infrastructure—the District will fail to attract investment due to the lack of certainty about its For more information, visit: www.lakeoswegobusiness.com and click on "Foothills" future.This situation is reinforced by the lack of activity in the area over the last ten years, when real estate investment avoided the area despite a booming real estate economy elsewhere in the City and region. By planning now, and removing the current barriers to development, the District will be poised to attract investment at the earliest possible date. I have some ideas or concerns about the project-how do I get involved? Send an email to info@wdwlo.com with your name and address and we will add you to the mailing list for future newsletters, event notifications, meeting notices, and other project communication. In addition, the Foothills District Citizens Advisory Committee (CAC) meets monthly to help guide the project. CAC meetings are generally on the third Thursday of every month, 5:00—7:00 p.m., in the City Hall Council Chambers, 380 A Avenue. (Note:The April and May 2011 CAC meetings will be on the fourth Thursday of the month.) Will new development in Foothills compete with Downtown businesses? The aim of redevelopment efforts in Foothills is to create the City's next great neighborhood that is complementary to and supportive of downtown Lake Oswego. By increasing the number of Foothills District residents and ensuring that new retail development in Foothills is neighborhood supportive and complementary to Downtown, new development in Foothills will help improve the viability of downtown Lake Oswego and strengthen the downtown area over time. Why are we talking about developing in a floodplain?Isn't that risky? Of the 107 acre Foothills District, 41.5 acres are in what is considered to be the 100 year floodplain. Of the 41.5 acres, 23 are already developed for industrial or commercial uses, and the remainder of the floodplain is in natural areas or parks that are not proposed to be redeveloped.The focus of the floodplain planning efforts will be on these 23 acres of already developed area, with an eye to removing the flood hazard from these areas. Future redevelopment of the industrial area will require intensive analysis of the floodplain related issues, including balanced cut and fill to ensure that flood impacts are not increased through redevelopment and potential impacts on wildlife, habitat, and endangered species are addressed.These types of issues are not unique to Foothills, and there are clearly identified regulatory pathways through which these issues will be pursued. Is the City going to condemn private property and hand it over to developers? The City is not interested in taking property from one owner and selling it to another in order to encourage redevelopment activity. For example,the City and the project team consider the Oswego Pointe Condos as "off-limits"to redevelopment efforts, primarily because it is assumed that the condo owners are content in their current situation and that redevelopment of the property is not possible unless all of the owners wanted to sell their property—a highly unlikely scenario. Doesn't the current economy make it impossible to think about real estate development in Foothills? The Foothills District Framework Plan is a long term (twenty year+)vision for district redevelopment. The current economic climate makes it difficult to think about starting a development project this year, or maybe even next. However, it is important to "set the table"for redevelopment when the economy recovers to the point where new development efforts are financially viable. Removing regulatory barriers (e.g., improper zoning,floodplain regulations, etc.) will establish a shovel-ready environment in Foothills and advance the time frame for development to the earliest date possible. For more information, visit: www.lakeoswegobusiness.com and click on "Foothills" How much does the current planning process cost, and how is it being funded? The total budget associated with the Foothills District Predevelopment Agreement is $1,300,000. Project funding is being provided through the following sources: • $800,000—City of Lake Oswego • $130,000—Foothills Industrial Property Owners • $295,000—Metro (Construction Excise Tax Grant Program) • $75,000—TriMet The $130,000 property owner contribution is being paid by six industrial property owners in the northern portion of the District who control approximately 10%of the District area (hence, they are contributing 10%of the overall budget). This contribution is being structured as a loan by the City, secured against the subject properties, and the loan will be repaid with interest within five years of completion of the Framework Plan. In addition to the $1,300,000 budget, the City has also set aside $200,000 to retain a financial consultant to provide a third-party analysis of the economic impact of the Foothills District plan, including overall development value, public revenue generation, return on public investment, and overall financial viability. How does the proposed Streetcar option affect the development of Foothills?Are the two projects dependent on one another? The current Lake Oswego to Portland Transit Study is contemplating, among other options, a Streetcar connection along the Willamette Shoreline rail alignment, linking the Foothills District with Johns Landing and South Waterfront in Portland.The Streetcar option provides an opportunity to explore development scenarios for Foothills that incorporate transit as a central element of the District, potentially reducing parking and traffic impacts and increasing residential density. How will future costs in Foothills be paid for? It is too early to determine what the future costs for Foothills redevelopment will be, or how those costs will be paid for.As the plan progresses, the financial viability of the District will be continuously analyzed to determine the proper course of action and provide realistic projections of development costs and potential funding sources. It is anticipated that a combination of public and private investment will be required in order to catalyze development activity in Foothills.The level of public investment must ultimately be measured against the public benefit delivered and the return on investment that the public can expect. Are Foothills District Property Owners supportive of the project? In addition to the six industrial property owners that are helping to fund the planning effort, there are a number of other significant property owners in the District.Three of these ownership groups—Terramar Retail Centers, owner of Oswego Village Shopping Center; Prime Group, owner of Oswego Pointe Apartments; and the Oswego Pointe Condominium Association—represent the bulk of the District's developable acreage, and are active participants on the CAC. Each has expressed a positive interest in moving the planning process forward and exploring the possibilities of Foothills District redevelopment. The project team will continue to work with all property owners in the District to ensure that their issues and concerns are addressed. For more information, visit: www.lakeoswegobusiness.com and click on "Foothills" Alk ' - '' r - 'Y i ' Xh � - `. _ } = C . Zyy IVT Ai AP I. 4 ,4, 4i' 2 4.- 114,4"... i . .1.., ,••••.••• • ...- p.p.- , ..... _. . •ilk. . ,,,, • ' 7 1.. . Nir , �•~ .�-- ,' .�w) a. � Y" .Y. �S '' tom•. 1%lir 1_,a i. I. •... , . 4 r .4 irt-rp, . -, . . .....or ..... . r . • I P'4 I I,_41°lk:+11 t''frAfil''914* I W--a Ilk , OP, frf vi4 4y,Jit , -.. iet-i-44-:1111. ... . ..- - . 1:4 "1"14 ..T-..''10* q .rs .g 1 --..... Ask a.: r 1 r t,,,,i ,p - V 0. L .14„,,fr. \‘ -cf..i.L.4 C??1-1: 0 __. A , ;' <4' mot 4114,0. ,,,,A , C. Foothills District PLANNING UPDATE Lake Oswego Planning Commission Framework Plan June 27, 2011 4W "''- ;I :-...'i ,• •-:-.. 1 ' :.' k• - . . -: -----," 111 / ___ ' •-. it /- • • : Vita 1. FOOTHILLS [ LAKE OSWEGO ] •:. li ... ... ...,.. %..i.., , . , . I --aLtli ... ,-- -- •"*. :•• : P-:-.1-.-.21 .1 -- !.• II DISTRICT BOUNDARIES . 'I% i.... ..... s... • -... - !..... I„II . is. arab P. f- '17-ntw,.' I., .vi' ...'•-• , 1 '-Q. ... ,,,,,„. _.....-,- .. .../r0Wfuf• • ,i". '..i. . . '-.4.4. -... -:._2-27.- . ,... -"'".-- irk: I'S .• , 41 . . Ff ft-Li , !'1 :I I le.. tr. er• :- ;.,. . r... . ,, •.. r • • , ,.._, ,....:. • v 4 ..... . I, 111 •.... • . .*. 11 &Wilt .I' ;I'.•. I T ,1 •-!..i. IX., .- ra , .-ip - ' #21- ' : r 41:• f' - .. .., i• .lei . i 1 - ,_._ : s _• . . ...e. ..: i • 1 II t • _-.-E--. ,---- . . .. ,.• • • 1 q ' •• 8 - r.ill •r.-.- -1—.7 -: I • t. i I 112i - L fr ! F . Iii.7 1 i , . I -. - 111111111\ 15 . ilt • .1- j r .. . . , L. ,_—-.=7,. -. 'I •',.: IL, .. "••• :-.2 - . Li i • .'.. . ,:... - -.T---1 . ' ..•1 ligit ,..„N• ..... • ., ,•,:.•_. ....r; •. i ..., :•. • L. -.....or. .217....irj? IV .4...- . I r•.. t• .._. ..: . .r.. • __.• ,:,...• ..,.;, \ . ....,„, 0.);,,. .n.• .. • 4-1 e . .A. • . . ••.-:4 ? : . fi ,-.. . \\ \.. :,!..irt ei 0, - • i ....... • . i . •„, •J • ....„.., \:....•... , .41.4 ,....„,•-••_ ,.. . , ,....:, .2" .•, ,--rr :...' . •. i ti... ''...!?: -' ',..f. ......--1.4. .1. a —4 :F. .... -= 'WIPP 401 1 . '5.' gtiv4.- -14-.44151tc!.?r,i. • . ... , -• .- _... . i.,....s :. - 1....I' I. ;.'w•MT- •••- --'... 0. ....4,.4.4 .'..i•":."aI-V.r.".•.;lal'1,.-• ...i.f.•7.'.7'.''.' •..... . lWO.i g-ft. rtF. .l...:-..- .-"1-,!I''l;i.lsi,t.ii rr•t,.- l.I'oi1 *;••ri•.'..r....''P•..V I P. Arp• 1 141.l e 2 1 l tik 4..-....—14.._.0--r:._•LiL.._"- iM A.•1: -7M 4.1,/ 1. i1 .• -; 4.4''‘ ' 2410.• !. .' ' .-i .i, .., .,t 1.4*.,I. ;7,11%h'i*, .. :..111111111.- lie 7 -.‘', - ., -'-... % 'llt.' '' 7. '• r e P . ...fijr,ar .. •••04y - .01. • -ft .1.• i 1,1.4:. . :V f •• .71'. . Si .•---I'm .. ''•- .0:i. r L'... . I--.4-: .P.' •eilie. • - • •-• - - —..157111115 . air mi...4 IF ••11 FOOth WS SW e. . .017.1ziosed FDDL-hillS — 114,•L• . • " '- -..." Ar.i.:15.Aria r1.7.--t*rrigigt 7. rr-' PrKl#6111.5 StrWIrsIr n▪m:' ...--••••1 .._,W-:.:litinir NW ia . ...IL :r. 11 AgaPI l'ham;.Nly 200 IC :.4...4 1._..). 1,-... gilL7eir . ,K., •• fiDll Fir' 471.43713P::"..-'' r!..' .7.-4.r • F cc I ‘ ..0., a WORK PLAN OUTLINE ® FOOTHILLS [ LAKE OSWEGO ] WORK PLAN OUTLINE Team Organization+ Project Management A Inventory+ January 2011 Analysis Framework Plan March 2011 Goals+Concepts Development Infrastructure Implementation Viability Plan Strategies Development Feasibility Transportation Analysis Overall Cost Summary Wastewater Treatement Street Plan/Street Standards Funding+Financing Plant Analysis Parks and Open Space Opportunities Urban Design and utility Services Public/Private Partnerships Neighborhood character Sustainable Strategies implementation Strategy'+ Floodplain Mitigation Cast Estimates Action Plan July 2011 Draft Framework Plan Final Framework September 2011 Plan I I I I Post Plan Amendments I I I I - Floodplain Comp Plan+ Design and Development Mitigation Zoning Code Development Agreement V Standards r 1 . a!� �-f FOOTHILLS [ LAKE O S W E G O ] = . '._ VISION STATEMENT - "ate . i p. ir 3 " 4 � r p , : A 1 r Ei s �` ' it 111 � A y '.r. i1. :- .- sh-:' . _- .s.. -:-:-' klff.v.-11,7-4- _T--, : 121;T:I::141V-`7.1A-?„--7' , -.... '1 I.1.1t:*:.P-Lli:ir T P e I ,{I 11 �. 7 . r ra 9. I 'f T s ; �� ry- ,i.,.-ble7,iikl.y"-. :,,,::l-.p.,4,,,,-',) ; ,, yam:• � , 4 . - . r qr y -1 .., a ,i+ Y rj. �` i Arl h� figg' ti '.+ F , tG : r:. -- ,t, ;�� +fin;+1311- `•J ',- The Foothills District is Lake Oswego's greatest opportunity to provide the community with a significant riverfront presence. Building upon the recent success of Downtown Lake Oswego, the District will redevelop in a manner that knits Downtown Lake Oswego, Tryon Creek, Old Town, the Willamette River, and Oswego Lake together, and in the process will establish Lake Oswego's next great residential neighborhood. Helping drive the success of the neighborhood will be a connection to Downtown Portland via the modern Streetcar and an environmental mindset that considers sustainability as a central tenet of the District, from the planning phase all the way through construction and operations. The District will possess a thriving, comfortable and inviting pedestrian environment, with clear and convenient connections to surrounding areas. A mix of uses including a variety of housing options, local retail to support the neighborhood, complimentary office types, and open space and recreational opportunities will provide vital activity not only within the District but also across State Street into Downtown. Given the many natural and man-made amenities that exist in and around the Foothills District, this new neighborhood will be unique and like no other found in the Portland area. ° 1�� 4 ' FOOTHILLS [ LAKE OSWEGO ] 5'�` s GUIDING PRINCIPLES , comom V �.-ar o f s k '.'la ■ V I. - �. 141,1 - i' • Connections ,s tax t_ €� �.' rsl- ii •- _ ". • fx • Sustainable Development 1 1 r, At , z' 1 1 { ' r! j r!\\ PP • Residential Diversity and -s �: �' Innovative Design v 7..;1�` b•/a y Y ;� ,�, , ,r r� • Design Quality `0 .a ,4, Public Open Space p p .,. .... -r. -9 „ , •� -,. q, 4.- �, • Economically V iable �,; ti pry' , ., Development - r �. �r.. .n r. _ ti - , 41,, �,a , a • Appropriate Scale and Design . • Good Partnerships � • Strong and Diverse Ground xR Floor Retail v= l ' I„ °fy Yf ,g � it ' vs X: A , �' " • Balance •;' x s` xYn� e :. ,r r"' R Y�i� ,,r rj • Focus on the "First Thirty Feet" , -,. -T.A...i. .,4i:itt:r., ;,; • Transportation Access and Wit , 4 ,, Linkages FOOTHILLS [ LAKE OSWEGO ] PUBLIC INVOLVEMENT Citizens Advisory Committee Public Events • 14 members • March 14 Open House • Neighborhoods, Property • July 14 Workshop Owners, Stakeholders • Early September Open House • Meet monthly (third Thursdays) Additional Outreach Oversight Committee • Neighborhood Associations • Mayor Hoffman, Councilor Tierney, City Manager Alex • City Boards/Commissions McIntyre, John Stirek (Trammell • Other Interest Groups Crow), Ralph Tahran (retired OTAK Principal) Public Communications Project Oversight Group • Project Website: www.lakeoswegobusiness.com • Lead City Staff for technical areas • Hello LO • Media Outreach FOOTHILLS [ LAKE OSWEGO ] INVENTORY AND ANALYSIS 1 . Base Maps 2. District History 3. Natural Systems • Geotechnical Site Conditions • Phase 1 Environmental Site Assessment • Wetlands & Riparian Habitat 4. Transportation 5. Infrastructure • Public Utility Infrastructure • Private Franchise Utilities 6. Streetcar/Rail 7. Wastewater Treatment Plant 8. Floodplain Development Feasibility Analysis 9. Land Use 10:. Education FOOTHILLS [ LAKE OSWEGO ] ESSENTIAL CONDITIONS • Financial Feasibility — WDW preparing cost estimates, reviewing with ECONorthwest team • Consultant Selection — Essential Condition has been satisfied • Streetcar Planning — Planning for Streetcar project continues; LPA process to be resolved in early 2012, Foothills project studying Lake Oswego-related Streetcar issues • Wastewater Plant Modification — WDW, City of LO working with City of Portland on Facilities Plan Update, WWTP mitigation strategies, sustainable features interface (e.g., district heating/cooling, reclaimed water, etc.) • Floodplain Mitigation — Preliminary modeling completed, no rise in flood elevation found; next step is to identify mitigation strategies and costs • URA Feasibility — ECONorthwest is working with the City and WDW to analyze development scenarios, URA expansion/creation options, and generate cost and revenue projections. ` *4' f a 4 "r "Y i. '# FOOTHILLS [ LAKE O S W E G O ] . ' .. it . . . FLOODPLAIN ANALYSIS --i _ir., .,..._ , , i . . ., , a_ , • . .,..._,.„ F., . . . ... 7..4,,L ' A!,,.. , ' . ' w _ • 40% of District within 100 year ■ f r � II Floodplain ` • . , p ' • +� A. ..,• r' k, • 31 • Substantial Portion of Industrial ,. !• .r .. ; I, # ' Area within Floodplain ter. .- "• r •I --- .sy r � !A t. ,bra , ,. . -; API - st • Area of focus is already 'Al. ,,,,, -,K if ' • developed i',X' : Jr,.. '_ A. . jr'i 1..- . ti,. !!':111111:*.. ..'.7...rrt;)i;11. 0,11i �" .011.' •itk ..-•- .,,,.. , , - Via. - w - • - - I i g+ - yr !I! f ..4,....."10.• . . .. ' ,.. . ..' q i}:„.1,„41-c". ...t . ir, •1. r ;'1 �+�R '" { I I. • 1 . .. i4ro.wa ' —. .) rte. _ - y 1 r^� j . ill;. ' a 31:14 IF 4 "r ' i '� FOOTHILLS [ LAKE O S W E G O ] i. a _S k it a. -' f ' " . FLOODPLAIN ANALYSIS 7-144*---f, i!ilap s..iiit ",,, r i , -. • .1",. tr `+i � K r r � �� ' ' • Modeled scenario: Placement FILL w ■ i1 a AREA . `VC . of fill in Industrial Area r„ • - - • Fill placement reduces ' l li ', • . floodplain storage t �� � r '- 2 �r Shy I. , rtti, : ' '.. i`Y . • ' - ‘ • Preliminary modeling indicates i ' '`$ r ' ' lip ;r - only small changes in 100-yr '".471, tIL - w• ' flood elevations with fill in z.., ,. A !it- „t �, Industrial area. . . { } �> ill 111 _ _ `.•. Proposed conditions would ,�' . ,. : likely result in little or no increase . -.,.. i _.,, �. i` . * ,e = aka i r- . 0� *# , *;. J. .: in 100-yr flood elevation. • - x • - ` lli o. I : old ; • Most development scenarios w j ` " 4 ' '- + . would result in substantial fill ' •, 1` within 100-yr floodplain ;' { 3 . boundary. :1 : , ,r ; .}• • Fill in 100-year floodplain `�:' 11 i.•,;.. :r :T would require mitigation tr •a• CrIv' I+` y balanced cut and fill — in order to . ; f • '� `4I ; : "' �,� preserve floodplain storage w ��. #r '� * RF: f 4 - .may Context ram. Northern FOOTHILLS LAKE OSWEGO & Connections Gateway Matte _ [ ] * District Gateway °'""Lle; ,i 1 CONTEXT AND Parks " ? I'. : 1 - CONNECTIONS &Open Space f F1R5'� ,, !, • Potential Greenway Trail ` i orw �a. Cross1ng I f a a r�i rco N I� �N -�. Proposed Streetcar - ° I, i - ♦ ca,.enu Potential a �I ' Access to District U 1 • Connections to Downtown, - Potential Pedestrian q Access to District I 1 Existin Neighborhoods n g g mi r r ~^ ,r`'-- ?geenae z ;i 1 • Significant Gateways — Tryon r 1 g Y Y 11 i ram. R1$1rT A 1 L 11'►1ler,.) r�� = Creek, A Avenue, Leonard St. to Streetcar` 1 r 1,t/r el Stops ! i own VII �� ap„e-P ~-1 ir.OGatetway jIa c 'I _ r1 a =/ • Potential Vehicular Connections / i .__-_ ~ — Multiple Locations r1 i rCO RE,1r Lakeview 1 ir I r �r r Village r I I 1 •��j 1 y 1 r r 1 Greedy • - J 1 1 Trad UPRR complicates vehicular *Weak.. �� --Li.! access in northern District .f, .1 1 • Riverfront Trail Connections _. ,- I • Streetcar Alignment Lakewood ta. y Bay (z) a Options/Stop Locations Streetcar Terminus `#..+► 4 • Pedestrian Connection at B Southern `r - T,r„�-�,if Avenue Gateway p I \ f te°^urd.,,, I \ OLD \ \Q TOWN / AI II 1_- _ l _ r Development ' I Opportunities , /� �_, ``�% FOOTHILLS [ LAKE O S W E G O & Challenges tnPo _, , OPPORTUNITIES AND n Avenue Are Oppasnity .� ����� �� CONSTRAINTS ortu ...';'•.' \i I Steep Slopes ' I I � TN°n�eek. \ 5%) —� �� 1 rr— ~\l• I Parks cA.en„e / _/ / yI &Open Space Mr' , • ___ 100-year wastewater Floodplain I �' FI Treatment . ,.e Major Electrical j ,' 4I Plant I • "Fixed" Elements — WWTP, Transmission Lines e I `�\ \ ^I `, — Major `1 • -- / Condos, Foothills/Roehr Parks Wastewater Pipes a Aven4e I f FIRST a a ,_1 • Three PrimaryOpportunity a pp Y ADDITION y �I e Foothills Areas N / Pork s 1 rr���_ I • • Floodplain Challenges Lakeview Condominiums - Vr'ilage I ) '-'-e '*..i i a., __._.__ ..._—.-.'--- 41) I.\ • Topography Mrfkniu , /I �� Park m I,-- , ■■■ I / / • Utility Alignments — Sanitary, r >- _ __ PGE Transmission Lines r /I r\ Pointe fir 1Apartments • UPRR Alignment LakewoodBay ^,LI�r II 2 ,;' f oLwega X I t • WWTP Configuration Village I 1fill. Leonard Street OLD ��' N Al TOWN I I I ,- I I q 0 a o'2 al 06'''t 0 %,„,. w4. ,_, s7 .0 h],u8: �:`/ t-f� FOOTHILLS [ LAKE OSWEGO ] D.• s C ''q %�� PHASE 03 a 0 a e �, I of ° 0 F a c 0 SCHEME B a� 0 0 0 r ,, 1 ?,...0 0 /6/ i -y.--1-1-° cr-A .° r ) SS 0 cp lr 1 ?Dill �l [, 'il _„__:,g, , Q U 1 .05 ,,`. ,____._.__._, , , Lf r 1:0),, ._ i Ji. TUG TOq M o❑ 1J _ ��i 1 �~ rv,1 r�% 11 - -iL u0� r4/ , 1 t _,-; i ?) 2.03b • 02 1 a 1 DEVELOPMENT AREA 3.aT ( i. z,o5a 2 i ° GREENWAY 05b 2.06 3„., , — PUBLIC SPACE G RETAIL C r a 2'07 z.98 PARKING )j__ 3,04 ° �� POWER SUBSTATION p• up z.Jo o /J STREETCAR W "' b. ��. .i�Y12 b, L 2 TT t 1 30S OU //o FUTURE DEVELOPMENT— PHASE 01 b • = Q o !�f% FUTURE DEVELOPMENT— PHASE 02 Cln �flfla0 o FUTURE DEVELOPMENT— PHASE 03 . ; ,, - -? ..., -—. -._g_....-7 .. •.:‘,... ... / —1 + .'--.'' .......er I; i..../.. I: .... 11 .1 ' 1 -1: I! I i 7/.1 - .. '.. • ;, n• 1 . '..1 I 1 . . '. . " '' ' ' ..• "l• I I II 1 , • • .• ./., . pl, 4110% -.....-: ' '''1 .1—:. :I .' . --1. i• •--. - '''"' 'I FOOTHILLS [ LAKE OSWEGO ] II . l'• 1 'T ' -. • .• /. V 7 : 7/ ....1. . • . .•I ._. r"..., ' 7 : •- ,. -----.-.• • . ... - ' • PREFERRED CONCEPT 6--, • -1.,' • - ------ • • ir ' • - • •, ---, „. 1-, , _.. , .......: . . ---r .., r 7 i , • . ... .. I. : '1 ... ...., -7---, . : --, • --_1..-.... a • ILLUSTRATIVE _ 0 CONCEPT PLAN • u.. , •. tlifir. Asiyi_ - , ,...k. 1 a- . 7 1 ,,, -._. 1 - zy . . ,yilLip.AL - 41. I-"I' • __ ,..,2II;! -7_..... i . ir .011111.._. . •1_ ( .i. IL 7 --11!) ......illir vi •it i .....-_-_. •,- __,....!.. 0. ..iimit 1 1 . i li / . . , ..• .. • • . • ift•T%, ------ :: ii---?' 11 1 Atik'11111101 MK. •- — .- - 1,114•117i•TETA-,, P .. .•' _. '...._ i'. 3:, 1 ii . .11,itellillmi/1•44VIVIi. ,. ... -, y rk , ••••- A. J.. ' r i ... rr r. - 11111 I ' _ ......• 1 ;'... r, ' ' 4 .•I ..I ..- f./ I i ,r.. 1. ... iii,•., • . .... : ' • . A gat M ... ..... • ''.../ : i `•\ -- e_ ig ',Mir --...) h7 --- • '4 . ......,,, i I _ ....a ; 1 i•.-.4,1, 11----1------, , ., ..,,,., , .0.• d'.• le - 1 ' - '1 - ..... r ii!..MP'•r10. iTh ..,„' Aillt . iSI - a JE. .' ...• f ' .: • 'r I' . ' ..• •PE'. • . .. • 4 r cg•+Th'/,:/ ' . • , '` - -, . ......i. ./,'. ....- - ili: .11. I .1. . .i. / •_i , ' -.. .-1, --- .i.. -' ea '-' 1 P''-4-, aza t' itfirif-....z..•_ • , -.: - . . ' - • ' , • .5.-• . - I .., . r _ .r.. o' . . ; .1'-" "....!L =• •-..-% ...XL ./e: ''''. -..1.-.41 . . , - • - • - '• r .11 ,..... 1, ! 0 ,. lilka .. 0 .. illr. • -.. Ni." 1 ... ......ji. ....., . illi '• I -.•• • Nv-' •11 •,. .. . ‘ \ i ' . ; . . •-. • -4.. 1 '--r • - qiii .. -...._ --. .• ...." • • ' f -.- N• - Rd.. ' . ----- i .. . ----- . '" ---- lb '- e -- a . -i .. ' %; . ' .. '7-1 -- . 7 7 :IL 1.. 7 ._ ; • . -. . 6� RA'' 0il„ - P ,g Q q 0 8 � fo FOOTHILLS [ LAKE OSWEGO ] as 8 ,,° : (_) STREETCAR ALIGNMENT: Q �° ; {� UNION PACIFIC RR 63 0 f. 0 0 'J flCI 1z / t;r3 °a0 1- Pros 0 ° 00 0 s . t;r 9' / 1--- '\ p o � ��' \ Closer to Downtown Q 0 ;'Ji��1 ,��1 i Less Grade Change to/from -/4#=,� LI— 1 I '4 I ,3 1, i Downtown ,,liz ,__ ..,,,, '°, Tob ?,;l T�� , 1�,02� dor • Cheaper Capital Cost? (Single �01 I L, =-l'i =-- ; ... v'1 track, tie and ballast?) ❑OQO; )1 0 • Dedicated right-of-way C�. i/ ,,----:____,,9-_,P.-;1 f ./.:11:j..10—<>0., , , ______ o, 0 o Cons d OOO� 0_O00 ; 0\ q, Narrows adjacent development r 00 ,'`q,�'V 00 parcels if '' �� o • Does not encourage active uses 4 f %,_ s CD 000 , 0 a along streetcar line Q`� f' 'fl 1`00: �E i* 0 QQ _ • Widens UPRR "no-man land" [ate �; 0 ,� •:�0 ° 0 °° �0 • No significant improvement in . � g p °Q��O o �� 00 terms of visibility from OflgO -- 0 cr, 0 downtown „Ia _ 7 aE Q o /I q ,7 P . 7 8.7' .-g VI ' .Ni-l/ �} FOOTHILLS [ LAKE OSWEGO as a° �� cU� STREETCAR ALIGNMENT: Q �° %/ {�-' � FOOTHILLS ROAD a � oa b 0 % / ,. a - e o 0E)7❑ aQ LI, ; r o r ' Pros /_.6 u ` o _ �'..� .____ \V • Encourages two-sided development a Ili Lot; 1 ' ?. . ° 7--__._1 I I / I • Maximizes development parcels d to west a! 1.06 T.Oq , ;� -�,u r I �.�- 1 i1~ i.02� o 77 � -- __-f -. L[ • Potential to leverage federal L7zfp' ' _�- --�0� � E o��OQO, �.��0 ,❑ 0, 0 infrastructure (Foothill Road) r -- r j — :_ U • Increased Match Potential? ',DJ 0,. o ° r ir 0OOs •0,,0 d ,� o� Cons r :�00 , i`88'. '00 a �a a.❑ 0��-D OU • Further from Downtown oo 1— , ' (7 (Distance, slope) 4 iQ a sir '�: '.0O; 1C aQ • More expensive? (Double- P 0/ .0. A;0 I ° tracked, in-street design) o 0�0riiiii . � • 0o 0 • Operates in traffic O0 Q - � ,i7g _G 0Oda O / 00 STATE RAILROAD STREET 60'ROW sa . / uebaY . romr IIILa 0 A+iio'$ ------------- 100' +93' Ili Future •'S..• Foothills Road 60' Fill ..'-:-.---------------- _, Existing `--`-----20' Grade Streetcar Alignment - Foothills Road Option STATE RAILROAD STREETCAR STREET 60'ROW sa . "th"k . 18' . from cenrerlmc IIIL A la A+iio'$JT 100' ii7 II +93' .r .` . Future Foothills Road 60' --- _., ICI Existing _ 20' Grade --------• Streetcar Alignment - Union Pacific RR Option 001.1117 11 I.; 1 FOOTHILLS [ LAKE OSWEGO ] 1111 STREETCAR TERMINUS NiMF J ImImimm..I 11. N f r.. Z-171:11t; Si;X 1) II lir n I 1 , - - , •. ' . It: ill ill III 7-1 r----------- - , T.1!:1 1 A- r III I I. III' Jr JE8— 1 110.. i. 7:7 I II 1. :_• - i .. .1 i / 1.07 •,• — ,--) II , 7.04 1.01 —— II__• -_ . ?.0,9 I/ - r I . • J... 1 1•06 1.04 Ilk jip.. i— — 1 i 1 I I 1 ji I I ill - 1 I i . I .. ,._..."." .,. ,3.0: 41161IF +0 Ti. / ,./ 2.07 ' 2.6 I ill :2 ..._.0 7 ' 2,94 2.0d 3.0.1 •,;113 L , . 2.08 3,94 F LE I -- -- _ L r-kirg21 ..., 2.0, i , 11 . ------1 ?•0 -- r, I~L-' + • .'I. FOOTHILLS [ LAKE OSWEGO ] _ •�- 1- -1 - ' •'zz.''' . 1.0 STREETCAR TERMINUS I L_f t! I I I --, I I •- I I i 1I I Li I I L I I •.) I --� : I I ----_ - .' ��_ i I I I 1 I ,----- , I ,G'} '' I i I (i2 , cS f----=_ --1 11 i fir—_ —1 r ` `;.( 1\�� ! i I1.07 \\ I D i I , I _ I i .. ti II i 5 i I.1 1.08�.I .7.06 7.04 2 ii • { I Sf ; �y�_ Th. ' _ 1 • • +r + '' 1 /J I ' 1 -I I i - 2.04 -- I 2.03b 3•02 I _ If - - 3.01 5 j , 2,0.. 2056 2.06 3.03 J �L^ r 1 • Ir-—: ~7 ti i f--• Hf[7111EQEVELOINECi 2.07 I II f ' I Fit JE 03 I a 2-05 II I 3.04 J —A 2.09' 2�10'---S A. l-- 2.i1 r 3.135 FOOTHILLS [ LAKE OSWEGO ] STREETCAR PLAZA + TERMINUS -. ;,•,.,1 ... • .4 •• • 11.1-1 1111:1 I ` ' , L Ld , ' • a ,' ; �. 4 y ' _ • 4-s ' IIf . * LYy • - _ • . . i ` '' 4 tb / � T}' :; '.: i _• F x .% - _ • 1 \ i} _° i ice _ ., .�f •, .' .-_ -• 1 • • VV • {I I . +-. . II �_. _ ' _— • •.•,, • ip 4'� Y i.'.± '+T 5 -- d . - la' 'f Ur •ilL F '� . 4 F[-F �..' '�,' I Erg_ -"•'. 1:_ r •-- 1 y7'k' . 'I 'ti. ._ c'y T� �P1- -]]- �4�' lid .i3' ¢ '� '-"..r'�• __.- 'eft• I .. - 5 4 I-. l L �-2�. r •'Y - '1- ,• t VP. *•vr ,.aril l• I _ 'IT. 74 I. Ili • } a Y .1' r s f.. • If� �y .r.; • iiiiAir 1 _ 5 1011111117 r il I.,..:, 1 . • ILIH II U FOOTHILLS [ LAKE OSWEGO ] STREETCAR PARK + RIDE lit iwg........diri 0.--....4f ,,. . I . __„,..„ N ...., * *. .. „ .„. .: ._...__ _...,,,,.. .,. . ., .. ./.. , , • . . t „ „.... c- r I i 1 1 3 1 , 47 1,9 I . , i L ., ) 1 . / T.70'll i g , i . i 1.07 . .. 2.0,3_.,.b..„ 104_:"...,,• o2 77I _ Li. -. I ..:(2.07 i oi..., r 'ilti 1 .1 IOLN:dilii. • 1 I ill I . - - ,.._ .._. lk. 401 - - - ---L- III .. ' 1 - t / 1-9! .!)? II .., ;. , i 247 ,..„ , . 2.08 —_____ , . II . , . 444 , LE ' 2 op • 2 1 Cif"Atl'417 , 7—--- . 2.11 FOOTHILLS [ LAKE OSWEGO ] ... , . • STREETCAR PARK + RIDE 3 1 // 1----.:. . l.,. ...-;.--, II I //7/ _I .r . ). 12 It / 1 SQ.7120.ST 1 ' i 7 A . .,.. I . ? '' 61'.41057 rl_ i I . --- i_ e / , •. .. ,..': _____ _ ,/ . . .---. . . / •' . . ' . . . il 1 , . .--' :1401 '' -\OK---.,_..I . I I- I I ! 3.2.i 4.4 sp • ! 1.77 I , I I . . ! ! ......., i 1 T1 0 i I.1 licial,/ic) 1.00 I i ! • —' ri ------ ____.----— ..___. % e 1--11,----3 1 '---—.-, i _ '---1 i I p. , ': r ---- —.--i 1 '' 1---jj 1 ,, I.07 .it'- ,,,f I , —7 i -------J l' I 1 I.: 1.1.015 1 Q.U719,sF I i i;.1 1•03 1 ,. ,..\.._ 1,._. •I' 1 II • I ' a ;......-- i r.g...":0 4--Al I--_ I. •57••=00$F i 1 ; I ' L ___ :, Am 1--i ,, ___ .,,I1 2:.''02 3.0 i L__ .___ L E--- —,. ; : ----.: ; r, rj------------7 11.,--2-1-------- —______— . ' r --- I,) I 41 I 1.06 6t300v 1 H ' I. 1.__I i1 39.3C13 sr 1 .' I . . 4? f ,1 .1 J 1 f i / 1 L__ _--- ,----_ , ! i _ I X J ,, I 2.04 I X T .F 1 i ._____.- _._,_„_.----`• ._j , __- .____... 1 '. '--------.1-1 '-'.-- ' , .02 .' '. r ._ — ,..__—• j_ _, \ / 3m, _ .. ! . ..6 ).; A i 7----1_ . - 1 , , 2.05n .„ § i T 4k . ...:,./ . ( r 1_1 / ...„, .. .. . ., .., , 2 05 - b 2.06 3.03 I .6 _I i' i' / I r ,. PRIVATE RESIDENCES I I if / .....„........7.... 1 'I.\ '-"\. "...,I__. 2.07 z '..,..\ \. ..---.._ .. , . 1 .1. 4, i . 48 .. g -.4 i"I i ''.:'... .. .— ' • &04 • I n , 1 r 1 /1 irl 1 I . ... 2.09 0 • 2.10 I : i tia • \ r•-•,1 2.II I FOOTHILLS [ LAKE OSWEGO ] PARK & RIDE ALTERNATIVES STATE RAILROAD STREET - 60'ROW so' setback from centerline aft M+llort,. t.i- 100' +93' a Future Foothills Road 60' Existing 20' Grade --------- SECTION B-B : Streetcar Alignment Options FOOTHILLS [ LAKE OSWEGO ] WILLAMETTE STEPS ..� - • • i: 6 — max; _ �— • ki • \ :1 1 1%\ . ..,,.. ...• . . ::m____ 1: — 1 = y it :; ., T ,N ' J I '}- ' 7.77 r. „i r.. may. ;` I , ^-r-;x� !_ .: s . .a, .. pa # ' .;Y ,-iP. '• ar, -f • ... . ii •. ' .' F. _ , _ . . . _-„,...e....‘ _.....„*. •. ...-.-. ,.. !i,- .10 .5.1 --,.._. ., ., . . _. .___.,... _ ., J: • .e......_ .... . ,_ " . F • I.� � , ^+ ���' � _ ': ',tip � I� :• -Lce .. . 1 1. . .----z.„„z„-F_-__:„ .1...,-644 . -..lot r. !kiii, . ,r,_.7-.._ . - .. t +_ 5}'h~ . 14UL1�i�L .: F• I 5j - - 5 - Cw; .: �r15!a of f I _ } -. .... 1F, s f J� � = 4 _ _ 1 .. +` �.• '� k Ari f a Ali _ a 14 x !• -r _ �4a j _ - 19J {,..45 !' ��kzl} rY __ . .fit I r -_ -- J Y•.: it0'Wa • }. L•am• '~� -_ S. t • FOOTHILLS [ LAKE OSWEGO ] B AVENUE @ FOOTHILLS PARK • ... , • . , . , . ,.. . •- _..,--.... i ,•1 -. el .. • . _,:iriiie.--e- II gliffi- , . el 1,. ..„„._ Firo•r--1-,:i;i•.;..- ." 'ic- • • .. , 1_ •it...--; ..--- .L II - .."-•'' ..---, ...1.. t• t. • - . • - I . I .H-1-7%--• .\% .. - s : L .I -• -• - I : •[-Werl.----' I ..fk '' ••••::•: .. :•:.;. , .,:,... __ ..•'• ‘••... 4: • -'- • - • • 11-4110 i -'....-- ' _--I • ..-- ' 1 '.•M. -.... . r.Z5......d' • ••• -- - .24 .!L'''.- i ...i.i''''iri -.•' I --• ':-..;.:-.L.:: ! • -- ...•- '. '- '-. VI 1111P!!' 111.;.-- .V IL_ . • • . .• 5 . • ' r ZI r 1.17.'A , '4- J .),- '.....r j •4. ..oli N :.:- '')..iiilie• -• • .. F. la, ...al . ,...,is ,,..„t ,-: •,,,, pi i6..._., •:,,,.i. 'gm!" ...t. .•,i.,4.::. ..,il. .4..,.., r`',.• . 11/4. /.e..•'111...4:4: .., ........s.,_j'..-*.T.k.:f..•....k...,-;1 111-.'',,r: ..1`..1.-:-. . it::i prr,i6-,...:.% ,v.....,:e .421,51 ..... ....t.j...?-...Id.:.....: f•i •. 11 I.-,..; ',.-s4.._ _ .. . c,. . r ,.. • , .14..x.,.„.... . r A.:.?• . * • 1•P • Y- .r...'01 !•-, , Loo • icirei. .1, ,..• .,,, • . ,.• ,r u ..., • . i k,..,,,... . ,,,,r• ,-s..,..4, 1.,,,orki,. ..1 if,. ,,,,..F."..,.. .., , . - •1 .a.i-.. -..,'i --- - ---- ---.. - -- - ii- • 21 •••• . I'. ''" irthitgo. rk •zd.."' at- •••.,;• j . LIVr I 1 '-'. :'' • . -I.•-%• -V - .:-'i ...1.-'-gr. 1\-- • fr 1. . ..,. .. • - - • ;11 °I- 1."1.4 .. I ty).:,. c .." !%.-.,..',..L.:•-in f.,.- .2.,ii,.. viil 1 1 . . ''''S- 4.4 ..; F ' rill! NI i k . ...__ , it... ,:......./.,,,,.,..-. •. , ,.. 1 r - _,.---K... ,„ . . 1. • -2--•"-..f..5-:-?-1r-- •••• ...- ye,-.4...., .1 .- " - . .... J,... : r., ..,k, . il -. • ,-E ---- . 1 • J-i. , Mr 1,_.std...- , 1 - .-. ii-•- •••••.... .F- • , 1 ., ,m,-..r.., iL ...•. _!.. 1,4.!.:,....-..-„,wd,ar 1:11111!1 i' •- . t-'. s- . Alit, •1 -.ki 1 It .li I .n .--••••Y'. - .1 4111:4:1-4%,..•. ..':----, r- .6 .- , ::..ur.- -------1-Z,116+-5-.••:' ':-'-•'.. '.... J . ::-.,''rr-4 mo ors 41MM.1-14, 1.?-.'.17‘l--•••-• .;' r Iff.Wmi. -'---• ' 1' ••• '7,..1..f:--7 ••••••.--L..--.-:- '1.4.• •• :44_ ,;,_...,.., _ __ .w..... ....._7.. 7,. .w_-• _,=•• AL.7a-_-_,,,i I ' _••.`7.,` '.'",-:''': it III.. • • I ' --••-,:-.•!-• .. ,,g, . •L:••-4____. - , _-,W- ,- •,.../, ,\ ,) _ ---'.i., Bit ...„....i. ..:. • 1 • . ... •I L, r:i -•••-:,-.::-.7.7444,4541irr'._r---___ ejA. 7. . . . . .., _ .4,.. ___) ..* .1 ..'4, ; ,:•-,, ..i- . --- tigl 4 -.•. - • ' ... - .':•-41K-_:.-' ' r'' " : -_•;...f.jii ;:--6-4,.: • • • • ••• Nis& ..--• . :0... d d . .• ..r.• .. .1 • _. % .:;eif.- T -434F. !I?" l'..21•-• •:. Ir" ..... -. --.- -'.•!..-4?'r-L'I:' A ---7i'Teg..'•7•• k• ;Lk• ---r_ _._ 'e.5L-.'r. 'j'-L' -• ...912 '' •••• --- .. ' -r.•- '' -"- . Am-1-• i 0112-•11! 7'• . r.._ • : - .11-21 1115•::....'r -• ../.:11.1r:Ar..-• , ..4ralr - ; _. . L... . ---._. x. /-.7.7- iii.446;•••.;::f•'....„• . ,-,,r.r.ni..0•0.-'-11:0F1-. .-.. -- 4 ., ...7 ..-...-!..r. 4, 9 . ...I.7 4:05r.':• .X :.. .. Ir311'. - • , 2.1 • • - j . _ J) ,, .-i I . .. . -. -. _ 2i1J.,.. ' ., _ _ . , • - , 1 • -P : )1, . ::I .. -2111 -'''''' : : . 7.-. -r-LN, '‘ 1 rii, ) - 'j . , •.. . .'' i. / 7, • -:.i.:. ....:.. • : -• ... 4 iirl ....• .. -,- - -: .-• .eia. • ,,z4 7,.. i • "••-•••• • "..,!, : I-..- ••= I-Ir-..,•:•;. • , linel!- - . , • k 1, .p - LII'viiv• • • -0, .... ,, • _ tl . kri, `A.. .... , 'r. '" - - - ,- , z,7,-.----. 7„,....tA.,• . A -it 1., . - -- L . • . V 9. ...i'..' . 0 E-;• '1- -;91,.?.?-N„,:.•-; r•1 al-- •.-& ' • - -9( - ':•.-- - 4': ' - % '; 11.1' •'S. . •f :•: ' Yi. FP':' . •• . 4 P. . . ,.• . ' , rel.!;. i 11 -.).'' - ' . -1 ,elk •As.'•`. rL. At% 7 , ..„....,....,:k Y•-• .. . • - . ,_orev • 7.kwid.S.i.l.rr.or 444, .., . .,.• '..,..51-....,;:i.-.'-'.2 r-li A 1 .::-,..-..4, W.'L.----4i.'2 ,.c. '''...k -1'... : ,.. ;•.-:.-,,, • ' • '....'7 ,Lz!-.. I t.....4.. ., - --,.4,-,...L,! ,:„..,. .''..t•'I IlL11 . .ef.-..'• ..1 ... •• L'••• •• 1 -.0 1 , .m.mi..," 9.... - :7. 7.. . 2.,. .1„ 4,j,•_k„ ...., , ....., . . 4 3- 7- •••••.. '...., iiii„,z3vji . 2.4... v, ....,. ... . %Iry • . /- • - 9"•.:.-- ' • ! ••1 . 1 Ai'• - i „1,.., ., 0 • • t '1.•4. _,. '-‘,•,.-s. ' ilkapy, "'''' .77.I 9 .7..4, 110 D 1 • :r.. 4401 p.d..v CAI! ... •.. . .# . • . 9 131.0 ..4,MM -.-: • .Li ... 0. Prj ri:jUim - ''/ . r ". ' • .. I r'r 1 i i 1 f L ' '--f _ FOOTHILLS [ LAKE OSWEGO ] �1 _~_ / J BASELINE DEVELOPMENT ' ; - �- YTMENT TA C / VALUE ANALYSIS T EATMENT AGLI Y 32,144 SF 1 1 1 'j EXAMPLE - BLOCK 1 .03 f 0 ip \ ' O ,,,_ �\ 0 WITH 01 TRAY OF PARKING i i -__ 7----:\ 1f 1! 11 -7 -.--' , • 240' x 240' block 32.600 r it ' i' - • 57,600sf 05 j 1� - - - i1 /1 62'o78$F ' 03 ? i • 335sf per stall f f:' 57•600sF ; j • 172 parking stalls 0} .,_ ( j 3 S �. j 6430 F \ I 1 / - - - B _q��N�,E_- - L-_ 1 CONDOMINIUMS 8 / fli ' j r----- _� 1 .4 — 1 .6 stalls per unit ' ' r i ' 107 - 123 units sF j jj, 06 ! 1 04 /11/ j 0 $33.0 — $47.0M Value 1 68.300 SF / 39'300 SF 2 j 1 j J I 1 L- 24,000$F ------ -::___--__Y- APARTMENTS - -- -~ • �� 1 .2 — 1 .4 stalls per unit r ^ n . r ♦a 123 - 143 units in N i $25.3 — $35.4M Value �JEJ E I SENIOR HOUSING PRI ATE RESI N to _ 1 .2 stalls per unit i 143 — 172 units 0, ' # $33.0 — $49.4M Value FOOTHILLS [ LAKE OSWEGO ] NEXT STEPS June/July 2011 • Refine Overall Framework Plan • Establish Base Building Heights and Density • Preliminary Infrastructure Plan and Cost Estimates • Undertake Additional Technical Analysis (Transportation, Floodplain, etc.) July/August 2011 • Draft Framework Plan Recommendations • Distribute Draft Document for public comment • Revised Framework Plan as necessary August/September 2011 • Finalize Framework Plan and submit to City • Begin Board/Commission Briefings October 2011 • City Council Action on Framework Plan October 2011 — February 2012 • Regulatory Amendment Process Alk ' - '' r - 'Y i ' Xh � - `. _ } = C . Zyy IVT Ai AP I. 4 ,4, 4i' 2 4.- 114,4"... i . .1.., ,••••.••• • ...- p.p.- , ..... _. . •ilk. . ,,,, • ' 7 1.. . Nir , �•~ .�-- ,' .�w) a. � Y" .Y. �S '' tom•. 1%lir 1_,a i. I. •... , . 4 r .4 irt-rp, . -, . . .....or ..... . r . • I P'4 I I,_41°lk:+11 t''frAfil''914* I W--a Ilk , OP, frf vi4 4y,Jit , -.. iet-i-44-:1111. ... . ..- - . 1:4 "1"14 ..T-..''10* q .rs .g 1 --..... Ask a.: r 1 r t,,,,i ,p - V 0. L .14„,,fr. \‘ -cf..i.L.4 C??1-1: 0 __. A , ;' <4' mot 4114,0. ,,,,A , C. Foothills District PLANNING UPDATE Lake Oswego Planning Commission Framework Plan June 27, 2011 City LAKE Amik, oOSWEGO Foothills District Framework Plan O R E O N Planning Principles These Planning Principles were adopted by City Council at the outset of the Framework Plan process. Based on a review of the Planning Principles by the Foothills District CAC meetings, the CAC has recommended that the following changes (shown in red) be made to the Planning Principles for the Foothills planning process. These proposed revisions were shared with the Lake Oswego City Council on February 22, 2011 and will be presented for their approval later in the planning process. Planning Principles The success of the Foothills District will be felt and experienced on the sidewalks and pedestrian pathways that wind through the District - community happens on the street. The planning principles described below are derived from this central tenet. The principles focus on how to create a successful pedestrian environment, how to energize that environment, and how to connect the District to key areas and activities adjacent to and beyond the District. Along with a strong emphasis on creating successful pedestrian environments, two other values are integrated throughout. First, each principle is considered with an eye towards maintaining, reinforcing, and/or establishing a sense of place that is unique to Lake Oswego. Second, each principle provides a basic building block that ensures the viability of the final vision for the District, leading to on-the-ground redevelopment activity and the delivery of tangible benefits to the Lake Oswego community. A. Connections — Develop strong connections between among the District and surrounding neighborhoods, destinations, and places, including Downtown Lake Oswego. The success of this district will hinge in large part on the strength of its connections, especially at the transit, regional, and pedestrian levels. Visual connections will also be important including those from downtown through Foothills to the Willamette River. B. Sustainable Development— Implement sustainability planning and design principles for the District, and strive to establish Foothills as an exemplary Eco-district model in the Portland region. The District should be planned in a manner that would allow it to receive a "LEED ND (Neighborhood Design)" designation. C. Incorporation of Residential Diversity and Innovative Design — Ensure that District redevelopment provides for a diversity of residential types across multiple demographic and socio-economic groups; and that building design within the District reflects this diversity. D. Design Quality—Establish a standard of quality for the District that ensures long-term value, lasting quality, and the reinforcement of Lake Oswego's unique sense of place. E. Public Open Space — Develop a plan for open space and parks in the district, building upon the success and character of open space resources like Foothills Park and Tryon Creek State Park and providing Lake Oswego residents with "great good places" to gather, to meet and to commune with each other. The plan should strive to incorporate a broad variety of spaces, ranging from smaller, more intimate courtyards and plazas to larger community-oriented spaces, and open space should be integrated vertically in development to provide light, air, and visual relief. F. Economically Viable Development — Ensure that planning recommendations for the District are economically sound, leading to redevelopment activity that is consistent with the City's and community's vision for the riverfront neighborhood. Achieving the vision for the District will may require increased densities and heights, with base Floor Ar a Ratios between 4:1 and 6:1 and base building heights between 75 and 125 feet. G. Appropriate Scale and Design — Create design standards that encourage responsive design and a high level of quality and authenticity, ensuring that new development is responsive to its context and minimizes negative impacts on adjacent neighborhoods. H. Good Partnerships — Establish mutually beneficial partnerships that will initiate District redevelopment, define the public benefits of the project and provide clear expectations for project delivery on all sides. I. Strong and Diverse Ground Floor Retail— Establish a strong, locally-oriented retail presence in the District to provide unique business opportunities for local entrepreneurs and to generate the street life that will be essential to the District's sense of identity while maintaining a proper balance with the Downtown and main retail core. J. Balance — Create a thoughtful and responsible balance between man-made and natural environments, providing for the physical needs of shelter, home and sustenance while honoring the natural beauty of the District and incorporating environmentally appropriate design features. K. Focus on the "First Thirty Feet"— Establish an overall set of design standards that create a unique sense of place at the street level throughout the district and that integrate the design of the public right-of-way with the critical "first thirty feet" of development adjacent to the sidewalk. K L.Transportation Access and Linkages — Ensure that strong transportation linkages to and from the District are provided for all modes of travel, including new roadway connections to State Street/Highway 43 and the potential establishment of a Streetcar connection or enhanced transit service.