November PAC Meeting Summary

At their last meeting on November 17, 2015, the Project Advisory Committee (PAC) primarily discussed the median and sidewalk design at two intersections and they reviewed the Draft Streetscape Design Plan.

Sidewalks along the west side of two intersections along Boones Ferry (Firwood Road and Oakridge Road) are currently shown with a narrower 5 foot wide sidewalk rather than the preferred 9 foot wide sidewalk due to abutting site constraints. A proposal was brought to the PAC asking if they would like to request a design exception from the Oregon Department of Transportation to widen the sidewalk on the west side of the roadway at these two intersections. The change would create a tighter U-turn radius and reduce the size of the median at the intersections to accommodate the additional sidewalk area. The PAC discussed the issue and agreed that the additional sidewalk width would be desirable to allow for the inclusion of street lights and landscaping. The final design of these areas will come back to the PAC for additional review in 2016.

The remainder of the meeting was spent reviewing the Draft Streetscape Design Plan created by the project design team. The Draft Plan represents the accumulation of streetscape ideas including furnishings, landscaping, lighting, and sidewalk materials and colors, generated by the PAC and the public over the last year. At the next meeting in December, the PAC will review a Final Streetscape Plan and then the first half of 2016 will be used to refine the designs, identifying specific materials and plantings for the design.

The PAC will continue their monthly schedule of meetings through the next year.

The next meeting of the PAC is scheduled for December 15, 2015 at 9:00 a.m. in the Council Chambers at City Hall.

Boones Ferry Road PAC Meeting

The next Boones Ferry Road PAC meeting is scheduled for November 17, 2015, City Hall Council Chamber, 380 A Ave from 9:00 am – 11:00 am.

The goals of this meeting are to:

  • Consider options for wider sidewalks in constrained areas of the project
  • Discuss the schedule for final design, right of way acquisition and key PAC decisions
  • Review and comment on draft streetscape design

Click here for the agenda and packet.

Boones Ferry Road PAC Meeting

The next Boones Ferry Road PAC meeting is scheduled for October 27, 2015 at the main fire station, 300 B Ave from 9:00 am – 11:00 am.

The goals of this meeting are to:

  • Determine direction on lighting
  • Discuss landscape elements for the corridor
  • Further discussion on expanded sidewalk areas
  • Presentation about McDonald’s intersection

Click here for the agenda and packet.

A summary and the Power Point presentation of the September 24, 2015 Boones Ferry Road Community Meeting can be found by clicking this link.

Boones Ferry Road PAC Meeting

The next Boones Ferry Road PAC meeting is scheduled for September 24, 2015 at City Hall, Council Chamber from 9:00 am – 11:00 am.

The goals of this meeting are to:

  • Continue presentation of lighting and site furnishing options.
  • Discuss and agree upon style for site furnishings.
  • Identify locations for hardscape elements.
  • Final updates for the community meeting.

Click here for the agenda and packet.

REMINDER – Boones Ferry Road Community Meeting This Thursday!

You are invited to learn more about the Boones Ferry Road Project and share your thoughts on the project. The Project Advisory Committee will host a public meeting at 7:00 p.m. at the Lake Grove Presbyterian Church.  The presentation will being at 7:20 p.m.

Boones Ferry Road Project Community Meeting

Thursday, September 24, 2015 – 7:00 p.m. to 9:00 p.m.

Lake Grove Presbyterian Church 4040 Sunset Drive, Lake Oswego

 

Boones Ferry Road Project Community Meeting – September 24

You are invited to learn more about the project and share your thoughts this month. The PAC will host a public meeting at 7:00 p.m. on September 24th at the Lake Grove Presbyterian Church.

Boones Ferry Road Project Community Meeting

Thursday, September 24, 2015

Lake Grove Presbyterian Church, 4040 Sunset Drive, Lake Oswego

7:00 p.m. to 9:00 p.m.

For several months, the Boones Ferry Road Project Advisory Committee (PAC) has met to advise staff and consultants on decisions about the project. Their discussions have included roadway design to support on-site stormwater treatment and intersection safety/operation improvements. Working closely with designers they are in the process of developing a theme for the streetscape (sidewalks and public areas) that reflects the varied building styles in Lake Grove. Their goal is to highlight the area’s nature, history, art and sustainability. The PAC will continue to meet through 2016. Next year, more detailed design will begin, and construction is estimated to start in 2017.

Exploratory Pot-Holing on Boones Ferry Road Continues

Beginning the evening of September 8, 2015, contractors will complete the exploratory pot-holing on Boones Ferry Road north of Quarry Road. Work will occur in the evening between the hours of 9:00 PM and 5:00 AM to minimize traffic impact.

For questions, please contact Stacy Bluhm-City of Lake Oswego, Project Engineer at 503-697-6510 or Terry Song-WHPacific, Project Manager at 503-372-3518 or 971-228-9814.

EXPLORATORY POT-HOLING ON BOONES FERRY ROAD

Contractors will be doing some exploratory pot-holing along Boones Ferry Road to locate existing underground utilities. This investigative work is essential for the future design of the roadway. Work will occur on Wednesday, August 19th, and Thursday, August 20th, in the evening between the hours of 9:00 PM and 5:00 AM to minimize traffic impact. The location of work will be on Boones Ferry Road between Quarry Road and Madrona Street. Additional potholing work between Quarry Road and Lanewood Street will occur next week as well (exact dates have not yet been confirmed).

Please note, there is an unrelated project simultaneously occurring with lane closures near Reese Rd/Oakridge Rd. Thank you for your patience.

For questions, please contact Stacy Bluhm-City of Lake Oswego, Project Engineer at 503-697-6510 or Terry Song-WHPacific, Project Manager at 503-372-3518 or 971-228-9814.

Boones Ferry Road PAC Meeting – August 18, 2015

The next Boones Ferry Road PAC meeting is scheduled for August 18, 2015 at the Lake Oswego Main Fire Station (300 B Ave) from 9:00 am – 11:30 am.

The goals of this meeting are to:

  • Confirm roadway design approach.
  • Understand design constraints; identify intersection refinement preferences.
  • Learn about hardscape elements (specifically sidewalks, paving, medians and lighting) discuss preferences.

Click here for the agenda and packet.

Boones Ferry Road PAC Meeting – July 21, 2015

The next Boones Ferry Road PAC meeting is scheduled for July 21, 2015 at the West End Building, Willamette Room from 9:00 am – 11:00 am.

The goals of this meeting are to:

  • Understand and discuss existing topography and roadway section options
  • Learn about and discuss stormwater strategy, tool box and potential planting themes
  • Preview intersection refinements – Bryant/Firwood intersection

Click here for the agenda and packet materials.

Coming your way: a safer, more appealing Boones Ferry Road for all