- Building Home
- e-Permitting Online
- Permit Applications
- Mechanical Permit Application
- Plumbing Permit Application
- Electrical/Low Voltage Permit Application
- Residential Demolition Permit Packet
- New Single Family Residence Permit Packet
- Residential Alteration & or Repair Permit Packet
- Accessory Structure Permit Packet
- New Commercial or Tenant Improvement Permit Packet
- Fire Sprinkler/Alarm Permit Packet
- Commercial Roofing Permit Packet
- List of All Building Forms
- New Commercial Building Permit Packet
- New Commercial Mechanical Permit Packet
- New Commercial Plumbing Permit Packet
- New Commercial Electrical Permit Packet
- Tree Removal and Tree Protection Application Information
- Forms & Handouts
- Fees
- Reports
- FYI
Commercial Fire Sprinkler or Fire Alarm Packet
Commercial Fire Sprinkler and Alarm Packet
- Permit Applications will only be accepted between the hours of 8:00 A.M. to 11:30 A.M.
- Please provide valuation of the project.
- No permit is required for sprinkler heads when 4 or less heads are being added or moved.
- A permit will be required but without plans, for 5 to 10 sprinkler heads being added or moved.
- 11 or more heads a permit with plans will be required. Provide plans designed by a Fire Protection Engineer, illustrating hydraulic calculations & sprinkler cut sheets. The system must be designed under the current NFPA 72 & other applicable codes.
- Your permit expires if work isn't started within 180 days from the date of issue. Your permit expires if work is suspended or abandoned for 180 days or more. If you can't work within a 180-day period and don't wish to abandon the project, you may submit a written request to extend your permit for an additional 180-day period.