ADA Curb Ramp Project - Package Two

This project includes designing and constructing 17 high priority curb ramps as part of the City's ADA curb ramp program. The program aims to address accessibility gaps, enhance safety, comply with legal requirements, promote community inclusivity, and contribute to broader infrastructure modernization efforts.

In 2026, the curb ramps to be designed as part of the project include 17 ramps in the Westlake Park neighborhood and Bryant/Rosewood neighborhood, near Lakeridge Middle School:

Location/Intersection Number of Ramps
Bunick Drive at Avery Lane 4
Bunick Drive at Chelsea Lane 4
Bunick Drive at the Fire Station Entrance 2
Jean Road at the Maintenance Center Entrance 2
Jean Road at Tualata Ave 2
Bryant Road - Jean Road Fire Station Entrance Driveway 2
Jean Road at Tamara Ave 1

A map of the locations is shown below.

 

Schedule

  • Design: 2026
  • Construction: 2027

Project Updates

July 1, 2026

Preliminary design is starting on the project. Over the next month or so, crews will be conducting surveys and marking utilities in the right-of-way at each of the proposed curb ramp locations. This is part of early preliminary design work.

 

 

Project Details
ID: 
WO 396
Year: 
2026
Status: 
Active
Project Contact: 

Sonja Johnson
Project Manager
Email or Phone: 503.675.3999