Canal Circle UIC Decommissioning

Runoff from a portion of Canal Circle drains to an Underground Injection Control Device (UIC/Drywell). Due to the UIC's proximity to a nearby residential drinking water well, the UIC is not compliant with the conditions of the City's Class V Underground Injection Control Systems Permit, as issued by the Oregon Department of Environmental Quality. This project will construct an extension of the gravity drain system to the site, provide stormwater treatment and formally decommission the existing UIC.

Project is estimated to be complete in January, 2020.

Project Updates: 

October 2019

The Contractor, Parker Pacific Excavation, has mobilized on to the project site and begun preliminary work. 

Project Details
ID: 
WO 250
Year: 
2019
Status: 
Complete
Project Contact: 

Rob Amsberry
ramsberry@ci.oswego.or.us

Construction Line
503.635.0261