Sewer

Public Works Maintenance operates and maintains 206 miles of collection system with 13 major pump stations and 14 single-family pump stations.  All of these assets eventually flow into the Tryon Creek Wastewater Treatment Plant operated by the City of Portland on Foothills Road. Public Works Maintenance also provides information about rodent control, sewer odor complaints, lateral service connection verification, response to sewer back-ups and overflows, and missing manhole covers.

Wastewater Superintendent:
Phil Lawrence (503) 635-0280
plawrence@ci.oswego.or.us