Public Works Standard Details
Number |
Title![]() |
Revision | Download | |
---|---|---|---|---|
W1-01D |
1 1/2" TO 2" Water Service Assembly |
Apr 1 2023 |
![]() ![]() |
|
W1-01A |
1" Water Service Assembly |
Apr 1 2023 |
![]() ![]() |
|
SD8-01 |
18-Inch Beehive Overflow |
Sep 14 2020 |
![]() ![]() |
|
S1-01 |
20 & 28 Ft Local Street Sections |
Jan 1 2018 |
![]() ![]() |
|
SD8-02 |
25-Inch Beehive Overflow |
Sep 14 2020 |
![]() ![]() |
|
W9-01 |
3" - 6" Meter Installation (By Contractor) |
Apr 1 2023 |
![]() ![]() |
|
W3-01A |
Air Valve Assembly |
Apr 1 2023 |
![]() ![]() |
|
W3-01B |
Air Valve Standpipe |
Apr 1 2023 |
![]() ![]() |
|
S5-02B |
Aluminum Street Light Pole |
Jan 1 2018 |
![]() ![]() |
|
S6-04 |
Asphalt Repair for Newly Paved Road |
Jan 7 2025 | ||
S5-02E |
Avista Luminare Assembly |
Jun 12 2018 |
![]() ![]() |
|
E1-02 |
Biofilter Bag |
Jan 1 2018 |
![]() ![]() |
|
S5-01 |
Bollard Detail |
Jan 1 2018 |
![]() ![]() |
|
SD6-01C |
Box Frame & Grate for Ditch Inlet |
Jan 1 2018 |
![]() ![]() |
|
WW1-04 |
Cast-In-Place Manhole Base |
Jan 1 2018 |
![]() ![]() |
|
SD5-02 |
Catch Basin Frame & Grate |
Jan 1 2018 |
![]() ![]() |
|
E1-01 |
Catch Basin-Inlet Protection |
Jan 1 2018 |
![]() ![]() |
|
SD4-01B |
Cleanout (Outside Traffic Areas Only) |
Jan 1 2018 |
![]() ![]() |
|
SD4-01A |
Cleanout (Traffic Areas Only) |
Jan 1 2018 |
![]() ![]() |
|
S4-03 |
Commercial Driveway Approach Unsignalized |
Jan 1 2018 |
![]() ![]() |
|
WW4-02 |
Compression Fitting Into Cored Wall Tapping Tee |
Jan 1 2018 |
![]() ![]() |
|
SD9-01 |
Concrete Weir |
Sep 14 2020 |
![]() ![]() |
|
E1-06 |
Construction Entrance |
Jan 1 2018 |
![]() ![]() |
|
SD5-01A |
Curb & Gutter Catch Basin (CG-1) |
Jan 1 2018 |
![]() ![]() |
|
SD5-01C |
Curb & Gutter Detail "A" |
Aug 9 2019 |
![]() ![]() |
|
SD9-02 |
Curb Inlet |
Sep 14 2020 |
![]() ![]() |
|
SD9-03 |
Detention Pipe Typically Closed |
Sep 14 2020 |
![]() ![]() |
|
S5-02A |
Downtown Street Light |
Jan 1 2018 |
![]() ![]() |
|
SD1-02 |
Dry Well |
Jan 1 2018 |
![]() ![]() |
|
S5-02C |
Fiberglass Street Light Pole & Luminaire |
Jan 1 2018 |
![]() ![]() |
|
SD9-05 |
Filter Strip |
Sep 14 2020 |
![]() ![]() |
|
WW1-01 |
Flattop Manhole |
Jan 1 2018 |
![]() ![]() |
|
SD9-12 |
Flow Through Planter |
Sep 14 2020 |
![]() ![]() |
|
SD9-15 |
Flow-Through Rain Garden |
Sep 14 2020 |
![]() ![]() |
|
SD9-19 |
Flow-Through Swale |
Sep 14 2020 |
![]() ![]() |
|
W5-04 |
Gravity Thrust Block |
Apr 1 2023 |
![]() ![]() |
|
SD3-01 |
Hood Specifications for Catch Basins & Water Quality Structures |
Jan 1 2018 |
![]() ![]() |
|
SD9-13 |
Infiltration Planter |
Sep 14 2020 |
![]() ![]() |
|
SD9-16 |
Infiltration Rain Garden |
Sep 14 2020 |
![]() ![]() |
|
SD9-20 |
Infiltration Swale |
Sep 14 2020 |
![]() ![]() |
|
SD9-06 |
Infiltration Trench |
Sep 14 2020 |
![]() ![]() |
|
SD5-03A |
Inlet Catch Basin (CG-30) |
Jan 1 2018 |
![]() ![]() |
|
SD5-03B |
Inlet Catch Basin (CG-48) |
Jan 1 2018 |
![]() ![]() |
|
SD1-01 |
Inside Drop Manhole |
Jan 1 2018 |
![]() ![]() |
|
S5-02D |
LED ECobra-head Street Light |
Jan 1 2018 |
![]() ![]() |
|
S7-01 |
Local Speed Bump |
Jan 1 2018 |
![]() ![]() |
|
WW1-03 |
Manhole Bench and Channels |
Jan 1 2018 |
![]() ![]() |
|
WW2-04 |
Manhole Step |
Jan 1 2018 |
![]() ![]() |
|
E1-04 |
Matting Slope Installation |
Jan 1 2018 |
![]() ![]() |
|
E1-05 |
Matting Channel Installation |
Jan 1 2018 |
![]() ![]() |